Published January 24, 2024 at 7:00 PM

Updated October 1, 2024

Site work and paving for a sidewalk / parking lot in Indianapolis, Indiana. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Project Control No. 1901955 Federal/State No. 1901955 Ada Sidewalk Ramp Construction Marion County - Along Various Roads in the City of Indianapolis Qualifications: E(F) Contractors desiring to submit electronic bids via Electronically must register with INDOT as a valid bidder by submitting the form provided on the INDOT Letting Information internet page. Failure to register will cause failure of the Electronic bid submission process. A bidder may request valid bidder status by submitting the bidder registration form until 9:00 AM on the bid opening date. An executed bid bond shall be included with all bids. Only electronic bid bonds submitted through the designated electronic medium, either Surety2000 or Tinubu Surety Solution, will be accepted with the bid. A fully executed performance bond shall be included with all bids, except on contracts for roadside mowing, vegetation control, demolition, landscaping, fencing, seeding and sodding, bridge painting, and guardrail installations of $100,000 or less, when the bidder may elect not to furnish a performance bond. Electronically does not support submittal of the performance bond. The performance bond must be submitted to the Construction Letting email inbox or be delivered on paper by the time set for receipt of proposal bids. Each contractor that submits a proposal bid in the amount of $150,000 or more for highway improvements described in this notice is required to submit with that bid a written plan for a program to test the contractor's employees for drugs. The plan shall be in compliance with Indiana Code 4-13-18. The plan must be submitted to the Construction Letting email inbox or deposited with the INDOT Prequalification Engineer by the time set for receipt of proposal bids. INDOT - Call 711 - Ada Sidewalk Ramp Construction

Bid Results

Sidewalks / Parking Lot

$1,243,973.00

Public - State/Provincial

Paving, Site Work

185

7

3

4

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Contaminated Site Material Removal, Underground Storage Tank Removal
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications, Metal Castings
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating, Painting
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment, Collection and Disposal Equipment, Solid Waste Handling Equipment, Recycling Equipment
Division 27 - Communications

Division 27 - Communications

Communications, Voice Communications
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Excavation, Dewatering, Backfill, Compaction, Embankments
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Unit Paving, Curbs and Gutters, Paving Specialties, Pavement Markings
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Bulk Material Processing Equipment, Batching Equipment, Mixers

Find More Local Projects

Within 75 Miles of This Project
111
Active Projects
68
Bidding Soon
634
All Active Projects
303
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 18, 2024

March 18, 2024

img_map_placeholder

Multiple Locations, Indianapolis, IN

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

ADA Sidewalk Ramp Construction

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.