BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

This is a service / maintenance or supply contract in Fairfield, California. Contact the soliciting agency for additional information.

The Fairfield-Suisun Sewer District (District) is requesting proposals from qualified firms to develop the final engineering design, prepare environmental documentation, and acquire the permitting necessary for the Kellogg Resiliency Project. This project aims to create a nature-based solution to protect people and property from flooding, optimize infrastructure, provide stormwater treatment, and safeguard a stable and biodiverse future within a Suisun City, California community vulnerable to sea level rise and fire. Questions and Answers - December 19, 2023 The goal of the scope of work described in this RFP is to develop final engineering design documents with cost estimates, coordinate necessary permits and governing agency approvals, prepare environmental documentation, and provide bid period support for Phase 2 of the Kellogg Resiliency Project. This scope of work builds upon the Phase 1, 30% design which is available for download at Kellogg Resiliency Project Design, Engineering, and Permitting Project No. 4001 - Reference Docs. The desired parameters and outcomes for the requested services are: o Integrate community input into final design, where possible. o Review and build upon the 30% Design Package to develop a Final Bid Package for the construction of the Kellogg Resiliency Project. o Prepare construction timelines. o Develop cost estimates for construction for project budgeting purposes. o Identify and develop required inter-agency approvals (permitting requirements and coordination needed) for construction. o Develop environmental documentation for review and adoption. The selected proposing consultant team shall perform the minimum Tasks outlined. Proposing consultant teams will provide a detailed approach and scope of work in its proposal and use such as the basis for its proposed fees. The final scope and fee will be negotiated prior to recommending Contract Award to District management. The method of Contractor Selection has not been Determined at this time.

Conceptual

Water / Sewer

Public - City

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
165
Active Projects
90
Bidding Soon
1,866
All Active Projects
786
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 10, 2024

img_map_placeholder

Multiple Locations, Fairfield, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.