BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Fort Myers Beach, Florida. Completed plans call for site work for a water / sewer project.

Transport, deliver, and place beach compatible sand the Town is directly purchasing from Stewart Materials to restore public beach access points, improve public beach accesses with ADA guideline access slopes, construct new emergency berm, construct emergency berm segments to connect ,emergency berm previously constructed by others, repair emergency berm segments previously constructed by others, fill Newton Park, and fill scour holes to offset the impacts caused by Hurricanes Ian and Nicole. Questions Due Wednesday, December 27, 2023 by 4:00 PM The TOWN contact person for questions concerning Contract Procedure is Town of Fort Myers Beach, Town Clerk, 2545 Estero Blvd., Fort Myers Beach, FL, 33931, Phone (239) 765-0202. The TOWN will require a Bid Bond and a Public Construction Bond on this project. The Town of Fort Myers Beach reserves the right, in its sole judgment in the best interest of the Town of Fort Myers Beach, to waive any informalities in any bids; to make award(s) including multiple awards; to waive any non-substantive, in Town's sole judgment, irregularity or technicality in bids received, and/or to reject any or all bids. The CONTRACTOR agrees to perform all the work necessary to complete all items listed below. The OWNER has the right to accept or reject any or all part of a submitted bid. The project budget is $4,452,000. All work for the South Beach Repair (fill scour holes) must be completed before March 1, 2024. All work for the 7000 Block emergency berm must be completed before March 15, 2024 noting no equipment shall operate outside a 15 foot offset from the seaward berm toe after March 1, 2024 to avoid potential shorebird nesting habitat. All work shall be subject to the environmental protection plans defined the Permits and these Specifications. The Project is located along Estero Island within the Town of Fort Myers Beach, Lee County. The purpose of Project is to transport, deliver, and place beach compatible sand from the Stewart Materials Mine located at 2301 Edwards Grove Road, Immokalee, Florida 34142 to restore 26 public beach accesses, improve nine (9) of the public beach accesses with ADA guideline access slopes, construct new emergency berm along the 7000 Block, construct new emergency berm segments to connect berm segments previously constructed by others, repair emergency berms previously constructed by others, fill Newton Park, and fill scour holes above Mean High Water(MHW) to repair the South Beach and the 5000 and 6000 Blocks; to offset the impacts of Hurricanes Ian and Nicole. The estimated fill quantity is 112,000 tons (80,000 cubic yards X 1.4 conversion). The Contractor shall use no more than 140 calendar days for Substantial Completion and 10 calendar days for Final Completion from the date specified in the Notice to Proceed. This is the Contract Time, 150 calendar days, to complete all phases of this Project.

Award

Water / Sewer

$2,698,000.00

Public - City

Site Work

17

9

19

7

Subscribe For Documents

37 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
41
Active Projects
23
Bidding Soon
409
All Active Projects
153
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 10, 2024

March 11, 2024

img_map_placeholder

To Be Determined, Fort Myers Beach, FL

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.