EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 4, 2024 at 7:00 PM

Updated October 1, 2024

Renovation of a water / sewer project in Peachtree City, Georgia. Completed plans call for the renovation of a water / sewer project.

Fayette County, Georgia is seeking quotes for repair of high service pump at Crosstown Water Treatment Plant. Question Deadline 01/10/2024 at 2:00 PM ET Address any questions you may have about this request for quotes to Natasha Duggan via email to nduggan@fayettecountyga.gov or fax to (770) 719-5534. Crosstown WTP Replacement 12-inch control valve for High Service Pump #1 travel to Crosstown Water Plant. Provide 12-inch Cla-Val model 131-01 globe control valve with 300# flanges- 12" 100-01 Hytrol Body CS2 Solenoid control (120V VAC) CK2 Isolation valves on pilot assemblies Check Valves on pilot tubing with Isolation Valve e. Atmospheric Drain X117D Position Transmitter X141 Pressure Gauges X43 "Y" strainer Epoxy coating Provide PC-22D Pump Control Panel a. FRP NEMA 4X control panel Remove old valve and piping. Reuse existing butterfly valve and air relief valve. Fabricate custom discharge spool (12" x 4" x 12" Tee) to accommodate new control valve. Blast and clean parts to be reused. Prime and coat piping components with Tnemec N69 Epoxy or equal (butterfly valve, air relief valve and discharge spool) per Coating Schedule specified. Installation of new Cla-Val, discharge spool, air relief retrofit, Cla-Val controller and related electrical equipment. 10. Integration of controller with motor control center (MCC). 11. Inspect and record critical dimensions. 12. Perform Cleanup. Crosstown WTP Replacement 12-inch control valve for High Service Pump #1 SCOPE AND SPECIFICATION RFQ 2354-A: Crosstown High Service Pump 1 Pump & Motor Repair Additional Work 13. Perform Start-up. 14. Verify operation (manual and remote SCADA).

Award

Water / Sewer

$91,826.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

1

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
152
Active Projects
75
Bidding Soon
1,411
All Active Projects
676
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 18, 2024

February 19, 2024

img_map_placeholder

3500 Tdk Blvd, Peachtree City, GA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.