EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 16, 2024 at 8:00 PM

Updated October 1, 2024

Asbestos abatement and renovation of a residential development in Seymour, Connecticut. Completed plans call for the renovation of a 31-unit residential development.

Plans call revitalization and site improvements to 31 freestanding residential units. The project will be phased into 5 phases. We will be given (5) units to complete for each phase, roughly 2.5 months per phase, the housing authority will provide a swing space for the occupants during each phase. This project is under the CM contract for VASE Construction. They are the construction manager for the Seymour Housing Department and will award all work to the General Contractor. CHFA - 23-301 CDBG 2023 - TBD The Bid Bond Shall Be Made Payable To The Seymour Housing Authority And Shall Be Properly Executed By The Bidder. A 100% Performance, Labor And Material Bond Is Also Required. All Sureties Must Be Listed On The Most Recent IRS Circular 570. Attention Of Bidders Is Directed To Certain Requirements Of This Contract Which Require Payment Of Davis-bacon Wages, And Compliance With Certain Local, State And Federal Requirements. This Is A Partially Federally Funded Project. Note: Addenda To This Bid Will Be Issued Via Email. Contractors Intending To Bid Must Be Registered On The Advanced Reprographics Plan Holder's List In Order To Receive Direct Email Of Any And All Addenda. Bids, To Receive Consideration, Must Be In The Hands Of The Authorized Representative, No Later Than The Day And Hour Mentioned Above. The Seymour Housing Authority Reserves The Right To Accept Or Reject Any Or All Bids; To Waive Any Informalities, Or; To Accept Any Bid Deemed In The Best Interests Of The Seymour Housing Authority. The Contractor Who Is Selected To Perform This State Project Must Comply With Conn. Gen. Stat. 4a-60, 4a-60a, 4a-60g, And 46a-68b Through 46a-68f, Inclusive, As Amended By June 2015 Special Session Public Act 15-5. State Law Requires A Minimum Of Twenty-five (25%) Percent Of The State-funded Portion Of The Contract Be Set Aside For Award To Subcontractors Holding Current Certification From The Connecticut Department Of Administrative Services ("Das") Under The Provisions Of Conn. Gen. Stat. 4a-60g. (25% Of The Total State-funded Value With Das-certified Small Businesses And 6.25% Of The Total State-funded Value With Das-certified Minority-, Women-, And/or Disabled-owned Businesses.) The Contractor Must Demonstrate Good Faith Effort To Meet The 25% Set-aside Goals. An Affirmative Action/equal Opportunity Employer Mbe's, Wbe's, Sbe's And Section 3 Designated Enterprises Are Encouraged To Apply.

Post-Bid

Residential Subdivision

$5,500,000.00

Public - City

Asbestos Abatement, Renovation

34

34

10

2

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Allowances, Quantity Allowances, Payment Procedures, Schedule of Values, Administrative Requirements, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Control, Testing and Inspecting Services, Temporary Facilities and Controls, Temporary Barriers and Enclosures, Temporary Tree and Plant Protection, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cutting and Patching, Cleaning and Waste Management, Progress Cleaning, Final Cleaning, Closeout Submittals, Maintenance Data, Bonds, Project Record Documents, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition, Facility Remediation, Transportation and Disposal of Hazardous Materials, Asbestos Remediation, Lead Remediation
Division 03 - Concrete

Division 03 - Concrete

Cast-in-Place Concrete, Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Masonry, Common Work Results for Masonry, Masonry Accessories, Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Metal Fabrications, Metal Railings
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Wood, Plastics, and Composites, Common Work Results for Wood, Plastics, and Composites, Rough Carpentry, Sheathing, Underlayment, Finish Carpentry, Architectural Woodwork, Wood Frames
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Thermal Protection, Steep Slope Roofing, Shingles and Shakes, Wood Shingles, Roofing and Siding Panels, Siding, Wood Siding
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Wood Doors, Windows, Plastic Windows, Hardware, Door Hardware, Glazing, Glass Glazing, Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board, Tiling, Ceilings, Flooring, Wood Flooring, Resilient Flooring, Carpeting, Wall Finishes, Wall Coverings, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Partitions, Toilet, Bath, and Laundry Accessories
Division 12 - Furnishings

Division 12 - Furnishings

Art, Casework, Countertops, Furnishings and Accessories, Portable Lamps, Lamps, Rugs and Mats, Runners
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Escalators and Moving Walks
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Insulation, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Insulation, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, HVAC Fans
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Grounding and Bonding for Electrical Systems, Identification for Electrical Systems, Low-Voltage Electrical Distribution, Switchboards and Panelboards, Panelboards, Low-Voltage Distribution Equipment, Wiring Devices, Lighting, Interior Lighting
Division 27 - Communications

Division 27 - Communications

Voice Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Fill, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Planting, Plants, Shrubs, Trees
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Feeders, Feeders
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
549
Active Projects
315
Bidding Soon
4,697
All Active Projects
2,165
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 20, 2024

October 21, 2024

img_map_placeholder

SEYMOUR AVENUE, Seymour, CT


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Property Revitalization at Castle Heights - Rebid

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.