BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 12, 2024 at 7:00 PM

Updated January 29, 2024

Renovation of a mixed-use development in Starbuck, Minnesota. Completed plans call for the renovation of a educational facility.

Minnewaska Area Schools W.I.N. Academy Construction Renovation Bids Part 2 The Minnewaska Area Board of Education Reserves the right to accept or reject any and all bids. 1-Renovate kitchen area into new employee break room 2- Renovate weight room/ cafeteria into two separate classrooms 3- Renovate locker rooms and storage space into usable classrooms, storage areas and office space 4- Renovate bathrooms into updated usable conditions 5- Renovate existing child play area into infant room, with nap room 1. Kitchen/Break Room -Install lowered false ceiling. 2'x2' fiberglass tiles -Install new flooring- Choice of client -frame in old serving windows- sheetrock, tape and paint both sides -paint brick walls -Install new light fixtures necessary and furnish electrical necessary for commercial fridge/freezer and washer/dryer- Per clients chosen location -Move/lnstall Plumbing and waterlines for fridge/freezer and washer/dryer 2. Cafeteria area Renovation into 2 Classrooms -Frame up new walls to divide area into 2 class- Per client layout -3 new entry/exit doors -Paint new walls and existing brick walls -Install new flooring-Choice of client -Install lowered false ceiling. 2'x2' fiberglass tiles -Install new light fixtures and necessary outlets per code 3. Locker Room Renovations -Install lowered taise ceiling. 2'x2' fiberglass tiles -Install new light fixtures and necessary outlets per code -Frame wall to cover Pipes on exterior wall, up to window height - Install new windows in exterior openings -Install new flooring- Choice of client - Paint walls -Cut in, and install 2 windows in new office space, facing each hallway - New paint and flooring in hallway connecting to locker room - Remove Shower Heads and fixtures 4. Bathroom Renovations -New Fixtures and Toilets in all (4) bathrooms - New flooring and paint- Choice of client -Remove shower bay in locker room and install sink/vanity -Frame walls w/ door to separate bathrooms in locker rooms -Cut out tile curb into shower rooms 5.Infant Room -Frame up dividing wall with 1 door and 1 window -sheetrock, tape and paint wall - Install countertop with double basin sink - Create 2 new exterior exits, One in each room, (classroom and nap room) 6. Sprinkler System - Install automatic sprinkler system throughout lower level

Post-Bid

Educational

$600,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
14
Active Projects
3
Bidding Soon
177
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 22, 2024

February 22, 2024

Project location map

500 John St, Starbuck, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.