Site work and paving for a mixed-use development in Charlottetown, Prince Edward Island. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

Construction of sidewalks at the following sites in Charlottetown: Site 1 - Gates Drive from Massey Dr. to Trainor St., and Trainor St. from Gates Dr. to Irwin Dr. Approx. total length of sidewalk 295m. This site will include a 1.5m concrete sidewalk with integral curb, and stormwater management upgrades to account for new conditions presented by the new sidewalk (including but not limited to the addition of catch basins, storm mains, swale, sluice boxes, etc. as site conditions require). Site 2 - Montgomery Dr. from Mount Edward Rd. to Birch Hill Dr., and Birch Hill Dr. from Montgomery Dr. to Maple Ave. Approx. total length of sidewalk 530m. This site will include a 1.5m concrete sidewalk with integral curb, and stormwater management upgrades to account for new conditions presented by the new sidewalk (including but not limited to the addition of catch basins, storm mains, swale, sluice boxes, etc. as site conditions require). It is anticipated that the sidewalk will be located on the south side of the Montgomery Drive/Birch Hill Drive, though this will be confirmed in early discussions between the City and the successful Proponent. In addition to the 530m of sidewalk, intersection upgrades to the intersection of Mount Edward Rd. and Montgomery Dr. are to be included in the work. The intent of the intersection upgrades will be to shift the roadway slightly to the north, and to widen the roadway cross section of Montgomery Dr. to three lanes - 1 eastbound incoming lane, and 2 westbound outgoing lanes (a dedicated left turn lane, and a shared through and right turn lane). This work will include but is not limited to the adjustment/replacement of existing stormwater management infrastructure, existing concrete curb and gutter, existing traffic signal poles, and the existing westbound traffic signal heads to include appropriate signals to accommodate a dedicated left turn phase for westbound traffic. The limits of any widening/intersection upgrade related work is expected to be between the intersection of Mount Edward and Montgomery Drive, and the nearest intersection of Montgomery Drive and Birch Hill Drive, beyond which point the roadway cross section will be remain as one lane in each direction, plus the new 1.5m concrete sidewalk with integral curb. Site 3 - Moreau Dr. from Maplewood Dr. to North River Rd. Approx. total length of sidewalk 405m. It is intended that this site will include a 1.5m concrete sidewalk with integral curb, and stormwater management upgrades to account for new conditions presented by the new sidewalk (including but not limited to the addition of catch basins, storm mains, swale, sluice boxes, etc. as site conditions require). The side of the street upon which the sidewalk is to be located will be decided in initial conversations between the City and the successful Proponent. Documents are available at https://www.charlottetown.ca/business___development/developers/tendering_and_rfp The project is located in Charlottetown, PEI. The work generally includes the removal of existing topsoil, sod, curbs, asphalt, and sidewalks. The work includes construction of new sidewalks, boulevards, curbs, reinstatement of asphalt, grass, and other disturbed areas throughout various sites within the City of Charlottetown. Sidewalk upgrades will take place along Gates Drive, Trainor Street, Montgomery Drive, Birch Hill Drive, and Moreau Drive. The Montgomery Drive work also includes roadway construction, traffic loop detection, signal integration, signal phasing/timing modifications, etc. to accommodate a new westbound left turn from Montgomery Drive onto Mount Edward Road. Work will generally include, but necessarily limited to: project layout, temporary traffic control, utility accommodation, excavation and disposal of existing materials, new concrete sidewalks c/w tactile warning tiles, concrete curbs, storm sewer upgrades, asphalt road widening, and reinstatement.

Award

Sidewalks / Parking Lot

$1,248,547.00

Public - City

Paving, Site Work

14

13

2

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
29
Active Projects
25
Bidding Soon
175
All Active Projects
76
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 27, 2024

September 26, 2024

img_map_placeholder

Multiple Locations, Charlottetown, PE

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.