Site work for a water / sewer project in Niles, Ohio. Completed plans call for site work for a water / sewer project.

Niles Loop Project Fairlawn Avenue And Lawnview Avenue The work to be performed includes construction of approximately 550 LF of 6" or 8" waterline to complete loops from Lawnview Avenue to Trumbull Drive and Fairlawn Avenue to Trumbull Drive. Each bidder shall be required to complete and file with his bid the enclosed Proposal Guaranty and Performance/Payment Bond Form (Section 153.571 of the Ohio Revised Code) with a Surety Company executing the Bond, which is listed on the Treasury Department's most current list (Circular 570 as amended) and authorized to transact business in the State where the project is based. If the bid is accepted, the successful bidder shall enter into a contract and the Proposal Guaranty and Performance/Payment Bond shall provide the conditions in said bond, and as listed below A Contract Performance Bond in an amount equal to 100% of the estimated cost of the work conditioned, among other things that the Contractor will perform the work upon the terms proposed, within the time prescribed, in accordance with the plans and specifications. A Payment Bond in an amount equal to 100% of the estimated cost of the work conditioned for the payment by the Contractor and all Sub-contractors for labor performed and materials furnished in connection with the project involved. Engineers Construction Cost Estimate: $110,000.00 The successful bidder will be required to pay at least minimum wage rates pre-determined by the Secretary of Labor for the project work as required. The Schedule of Approved Wage Rates, as pre-determined by the Secretary of Labor is incorporated in the Contract Documents This Contract is subject to the provisions of Executive Order 11246 of September 24, 1965, as pertains to an Affirmative Action Plan, and Governor Executive Order of January 27, 1972. A bidder/contractor will be deemed committed to the goals of the City of Niles Plan Bid Conditions by submitting a properly signed bid. All bidders must fill in all blanks of the proposal in ink or typewritten. Entire contract book must be submitted intact with the bid. The successful low bidder will be required to comply with all Contract Requirements for Equal Employment Opportunities. The City of Niles reserves the right to reject any or all bids and waive any informalities in bidding. Each bidder must ensure that all employees and applicants for employment are not discriminated against because of race, color, religion, sex or national origin. No bids may be withdrawn after the scheduled closing time for the receipt of bids for at least thirty (30) days.

Post-Bid

Water / Sewer

$110,000.00

Public - City

Site Work

10

11

2

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Construction Layout, Execution, Application
Division 03 - Concrete

Division 03 - Concrete

Mass Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 13 - Special Construction

Division 13 - Special Construction

Integrated Construction
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Embankments, Shoring and Underpinning, Shoring, Sheet Piling
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fertilizing, Pruning, Bases, Ballasts, and Paving, Flexible Paving, Curbs and Gutters, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Sanitary Sewerage Utilities
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Manufacturing Equipment, Dies and Molds, Molds

Find More Local Projects

Within 75 Miles of This Project
137
Active Projects
84
Bidding Soon
1,345
All Active Projects
603
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 17, 2024

February 19, 2024

img_map_placeholder

Multiple Locations, Niles, OH

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.