Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 5, 2025 at 7:00 PM

Updated November 6, 2025

Demolition, site work, renovation and addition to a municipal facility in Niles, Ohio. Conceptual plans call for the addition of a 1,238-square-foot, one-story above grade municipal facility; for the demolition of a municipal facility; for the renovation of a municipal facility; and for site work for a municipal facility.

Per the owner, this project has been canceled. The work to be performed on this project generally consists of: Complete general construction package for a light gauge steel stud and joist/truss addition for the Niles West Entry. Work also includes mechanical, plumbing and electrical trades. A Contract Performance Bond in an amount equal to 100% of the estimated cost of the work conditioned, among other things that the Contractor will perform the work upon the terms proposed, within the time prescribed, in accordance with the plans and specifications. A Payment Bond in an amount equal to 100% of the estimated cost of the work conditioned for the payment by the Contractor and all Sub-contractors for labor performed and materials furnished in connection with the project involved. Architect's Construction Cost Estimate: $500,000. The City of Niles reserves the right to reject any and all bids and the City of Niles shall determine the rejection of any/or all bids is in the public interest. Question Deadline 06/21/2024 Planholders cannot rely on any oral clarification or interpretation of the Contract Documents and/or Drawings made by representatives of the Owner or the Consulting Architect. Matters which a planholder wishes to have included in an Addenda shall be submitted to the Consulting Architect at the planholder's earliest convenience, but not less than five days prior to the date scheduled for bid opening. Such matters should be presented in writing to Phillips | Sekanick Architects, inc. and can be emailed to michele@phillips-sekanick.com.

Project Abandoned

Municipal

$479,880.00

Public - City

Addition, Demolition, Renovation, Site Work

26

21

5

5

Subscribe For Documents

33 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
385
Active Projects
196
Bidding Soon
2,746
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 27, 2024

November 6, 2025

Project location map

34 W State St, Niles, OH


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed