BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 7, 2024 at 7:00 PM

Updated March 8, 2024

Renovation of an educational facility in Eau Claire, Wisconsin. Completed plans call for the renovation of a 9,197-square-foot educational facility.

As of January 25, 2024, this project has not yet been awarded. A timeline for award has not yet been established. December 20, 2023 by 5 PM Latest date for questions to be received from suppliers concerning this Bid. Questions must be in writing only; no verbal inquiries will be allowed. Hand deliver, mail, or e-mail to the Eau Claire Area School District-Service Center. Email: nsolberg@ecasd.us Removal of existing sheet vinyl and install of district supplied LVT flooring. December 20, 2023 by 5 PM - Latest date for questions to be received from suppliers concerning this Bid. Questions must be in writing only; no verbal inquiries will be allowed. Hand deliver, mail, or e-mail to the Eau Claire Area School District-Service Center. Email: nsolberg@ecasd.us Bid Submission Instructions: Bids can be paper mailed/delivered or e-mailed as follows: If mailed or delivered: A minimum of two (2) hard copies must be provided in a sealed envelope and be clearly marked as: Eau Claire Area School District - Service Center, Attn: Jeff Nestor 623 North Hastings Way Eau Claire WI, 54703. If the bid is to be e-mailed, it must not be larger than 50 pages, otherwise a hard copy sealed bid must be mailed or be delivered as indicated above in lieu of being emailed. If the bid is under 50 pages, it may be e-mailed to nsolberg@ecasd.us and the subject line in the email must contain bid # 12042023. The removal of existing sheet vinyl flooring, base, and adhesive. Installation of Patrcraft CMYK LVT flooring and 4" base. 1. Remove existing sheet vinyl, adhesive, and base highlighted in attachments 2. Dispose of existing flooring according to state and federal guidelines 3. Provide dumpster or other method for disposal 4. Prepare floor for installation per manufacture recommendations for CMYK LVT flooring 5. Patch and fill substrate where needed 6. Follow installation procedures per manufacture directions 7. Install new black 4" vinyl base and transitions where needed 8. Clean floor and area when installation is complete. 9. Estimated square footage: 9197 Sq/Ft 10. Work to be completed from June 10, 2024- August 22 2024

Bid Results

Educational

$11,985.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
121
Active Projects
89
Bidding Soon
1,057
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 4, 2024

June 10, 2024

Project location map

1801 Piedmont Rd, Eau Claire, WI


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.