Published July 16, 2025 at 8:00 PM

Updated July 17, 2025

Demolition, site work, new construction and addition to a fire / police facility in Roanoke, Virginia. Completed plans call for the addition of a 7,200-square-foot fire / police facility; for the demolition of a fire / police facility; for the construction of a 5,500-square-foot fire / police facility; for site work for a fire / police facility; and 2,500-square-foot fire / police facility.

The Read Mountain Fire Station Renovation and Addition project entails approximately 7,200 SF of new construction for the Fire Department housing living/sleeping quarters (1st Floor), and approximately 5,500 SF of new construction housing a 911 Public Safety Communications facility (2nd Floor). The new construction consists of a concrete slab on grade with concrete footings, CMU walls, partial concrete retaining walls, partial brick veneer or metal siding on CMU backup walls with insulated cavities, and corrugated metal deck/insulation/standing seam metal roofing on bar joists. A portion of the roof construction will also include concrete. The 911 Public Safety Communications facility will include a raised-floor computer room. HVAC consists of gas-fired rooftop units, VAV boxes, and redundant computer room units serving the raised-floor areas. Heating is provided by a gas-fired boiler with hot water circulating to the equipment. Plumbing consists of a gas-fired water heater and typical fixtures. Electrical consists of a new 1,200 amp three-phase service to serve the new addition and the Radio Shop, and standard lighting fixtures to illuminate the spaces. Conduit will run from the 911 Communications facility and the Radio Shop to an existing radio tower. The building will be fully sprinkled and will include a pre-action zone for the 911 Public Safety Communications facility A renovation area in an existing one-story component has approximately 550 SF of interior demo/new construction and 2,900 SF with new finishes on existing construction, housing offices, training spaces, and support spaces. HVAC consists of gas-fired rooftop units and VAV boxes. Plumbing consists of a gas-fired water heater and typical fixtures. Electrical consists of standard lighting fixtures and power pulled from existing panelboards. The renovated area will be fully sprinkled. A freestanding new construction Radio Shop facility of 2,500 SF main floor and a 480 SF mezzanine. The Radio Shop construction system is concrete slab on grade with concrete footings and piers, CMU foundation walls, cold-formed steel joists for mezzanine framing, metal building insulated wall/roof frame, partial brick veneer on CMU backup, partial metal building wall panel system, metal building insulated roof panels, overhead doors, and hollow metal personnel doors & frames. HVAC consists of gas fired heaters, heat pumps, and high volume, low-speed ceiling fans. Plumbing consists of an electric water heater and typical fixtures. Electrical consists of standard lighting fixtures and power pulled from the addition's new electrical service. Conduit will run from the Radio Shop and the 911 Communications facility to an existing radio tower. The new Radio Shop will be fully sprinkled. Site work includes grading, domestic water, fire service, storm sewer, sanitary sewer, underground electric, underground gas, underground telephone, fencing, asphalt paving, concrete pads, and landscaping. New diesel and new natural gas emergency generators are included. Any bid (including the Total Base Bid plus all Additive Bid Items) which exceeds five hundred thousand dollars ($500,000) shall be accompanied by a Bid Bond, the form for which is enclosed within the bid package (AIA Document A310-2017), payable to the Owner as obligee in an amount equal to five percent (5%) of the amount of the bid. The Bid Bond must be issued by a surety company which is legally authorized by the Virginia State Corporation Commission to do surety business in the Commonwealth of Virginia. Such Bid Bond shall guarantee that the bidder will not withdraw his bid during the period of ninety (90) days following the opening of bids; that if its bid is accepted, the Contractor will enter into a formal contract with the Owner in accordance with contract documents, included as part of the Invitation for Bids ("IFB Documents"); that it will submit a properly executed and authorized Standard Performance Bond and Standard Labor and Material Payment Bond on the forms included in the IFB Documents Question Deadline 06/27/2025 at 2:00 PM ET The deadline for questions and must be submitted to Stephanie Sparks at: purchasing@botetourtva.gov.s, planters, and trees.

Award

Fire / Police

$11,676,000.00

Public - County

Addition, Demolition, New Construction, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
145
Active Projects
69
Bidding Soon
763
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 14, 2025

September 12, 2025

Project location map

43 Eastpark Dr, Roanoke, VA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.