BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 17, 2025 at 8:00 PM

Updated October 18, 2025

Site work and paving for a road / highway in Issaquah, Washington. Design plans call for site work for a road / highway; and for paving for a road / highway.

As of October 17, 2025, This project is in design. It is expected to go out to bid in 2027 and start construction shortly after a contractor is awarded. Construction is expected to last 18 months. This will be to install intersection controls and access management along the Newport Way corridor from SR 900 to SE 54th Street to include one ten-foot travel lane, a bi-directional five-foot bike lane, an eight-foot landscaped central median, a twelve-foot left turn pocket (where required), six-foot landscaped buffers on both sides of the roadway, a six-foot sidewalk on the south side of Newport Way NW, and a twelve-foot mixed use facility for the Mountains to Sound Greenway that meets sidewalk requirements for a Parkway on the north side of Newport Way NW. Construction will occur in multiple phases. Project is included City of Issaquah Fiscal Year 2025-2026 Page No 76 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Install intersection controls and access management along the Newport Way corridor from SR 900 to SE 54th Street to include one ten-foot travel lane, a bi-directional five-foot bike lane, an eight-foot landscaped central median, a twelve-foot left turn pocket (where required), six-foot landscaped buffers on both sides of the roadway, a six-foot sidewalk on the south side of Newport Way NW, and a twelve-foot mixed use facility for the Mountains to Sound Greenway that meets sidewalk requirements for a Parkway on the north side of Newport Way NW. Construction will occur in multiple phases. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Design

Roads / Highways

$11,561,100.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
185
Active Projects
100
Bidding Soon
1,373
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.