Renovation of a water / sewer project in Lawton, Oklahoma. Completed plans call for the renovation of a water / sewer project.

Medicine Park Water Treatment Plant Filter Improvements Filter 4 underdrain replacement and media installation per requirements of the contract documents Bids received more than ninety-six (96) hours, excluding Saturdays, Sundays, and holidays, before the time set for opening of bids, as well received after the time set for opening of bids, will not be considered and will be returned unopened. Within Ninety (90) days from the bid opening date, the successful bidder shall execute a written contract embodying all provisions of the bidding documents. Estimated Cost Range of Project: From: $ 1,000,000 To: 1,500,000 For Technical Information, contact: Arun Srinivasan, Jacobs Project Manager. All Questions during bidding shall be submitted through electronically. A cashier's check, a certified check, or a surety bond in the amount of five percent (5%) of the bid shall accompany the sealed proposal of each bidder. Deposits will be returned to the unsuccessful bidders. Deposits will be returned to successful bidder upon execution of contract documents. Bids shall also be made in accordance with the prevailing hourly rate of wages for this locality and project as determined by the Commission of Labor and filed with the Secretary of State in accordance with the provisions of 40 O.S. 1971, 197.1-17, which prevailing hourly rate of wages is made a part of this notice by reference as though fully set forth herein. The Contractor hereby agrees to commence work under the Contract on a date specified in a written "Notice to Proceed" of the Owner, and to fully complete the project within 210 Consecutive Calendar days to Substantial Completion and 240 Consecutive Calendar Days to Final Completion The Contractor further agrees to pay as liquidated damages, the sum of One Thousand and 00/00 Dollars ($1,000.00) for each consecutive calendar day till Substantial Completion and Five Hundred and 00/00 Dollars ($500.00) for each consecutive calendar day till Final Completion thereafter as provided in the Contract and General Conditions. The City Council of the City of Lawton Reserves the Right to Reject Any or All Bids. The City reserves the right to reject any or all proposals submitted, all of which are subject to this reservation. Proposals shall be rejected for any of the following specified reasons (These reasons are not all inclusive): a. Proposals received after the time limit stated in the solicitation b. Proposal prices obviously unbalanced c. Proposals that are incomplete insofar as the Non-Collusion Affidavit, required signatures, or containing any irregularities of substance Notice of Award The Owner will make every reasonable attempt to award the contract within One Hundred and Twenty days (120) days of the bid opening date, but reserves the right to examine all the bids in their entirety and to take whatever time may be required, in the best interest of the Owner, to accomplish a complete and fair bid analysis. No interpretation of the means of the plans, specifications, or other pre-bid documents will be made to any bidder orally. Each written request for such interpretation should be addressed to the Jacobs Project Manager at electronically. To be given consideration, each such request must be received at least five (5) days prior to the date fixed for the opening of bids. Any and all such interpretations and any supplemental instructions will be in the form of written addenda to the plans and specifications which, if issued, will be posted electronically and available to all plan holders prior to the date of bid opening. Failure of any bidder to receive any such addendum or interpretation shall not relieve such bidder from any obligation under his bid as submitted. All addenda so listed shall become part of the contract documents. Contractor shall furnish a performance bond and a payment bond, each in an amount at least equal to the Contract Price, as security for the faithful performance and payment of Contractor's obligations under the Contract *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Question Deadline 01/25/2024 Each written request for such interpretation should be addressed to the Jacobs Project Manager at on CIVCAST at https://www.civcastusa.com/user/project/657c7d96ce2d997227ac868b/questions

Post-Bid

Water / Sewer

$1,500,000.00

Public - City

Renovation

10

15

6

4

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
61
Active Projects
38
Bidding Soon
391
All Active Projects
166
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 30, 2024

April 1, 2024

img_map_placeholder

To Be Determined, Lawton, OK

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.