BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 22, 2024 at 8:00 PM

Updated May 31, 2024

Site work for a water / sewer project in Lawton, Oklahoma. Completed plans call for site work for a water / sewer project.

As of April 22, 2024 project was awarded to McKee Utility Contractors, LLC, awarded amount is $4,064,781.70. Rehabilitation of approximately 32,791 LF of 15-inch to 48-inch gravity sanitary sewer line in various locations in the City of Lawton, including cleaning and bypass pumping, as well as all fittings, services, and appurtenances as shown in the contract documents. Only hot water cured liners will be considered. Contractor is responsible for all material, labor, and equipment necessary to complete work. For Technical Information, contact: Rusty Whisenhunt, Project Manager, COL, Phone Number 580.581.3405 Sarah Sikes, Project Engineer, Garver, Phone Number 405.666.2837 Estimated Cost Range of Project: From: $1,6400,000 To: $1,8100,000 Install approximately 6389 LF of City-Supplied Vylon PS 46 36-inch and 42- inch gravity sanitary sewer line in the City of Lawton, including 5-foot and 6-foot diameter manholes, bypass pumping, as well as all fittings, services, and appurtenances as shown in the contract documents. Contractor is responsible for all material, labor, and equipment necessary to complete work excluding the Vylon PS 46 36-inch and 42-inch pipe. Each written request for such interpretation should be addressed to Rusty Whisenhunt, Director of Public Utilities, City of Lawton Public Utilities, 2100 SW Sixth Street, Lawton, Oklahoma 73501, or by email to willie.whisenhunt@lawtonok.gov Question Deadline 02/16/2024

Award

Water / Sewer

$4,064,782.00

Public - City

Site Work

24

8

14

7

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
106
Active Projects
56
Bidding Soon
700
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 5, 2024

May 7, 2024

Project location map

Multiple Locations, Lawton, OK

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.