BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Lumberton, Texas. Completed plans call for site work for a playground / park / athletic field; and water / sewer project.

The Work of the Project is defined by the Contract Documents and consists of drainage improvements, recoating of the existing surfacing on the running track and field events, and replacement of the existing Synthetic Turf at Lumberton High School, Lumberton ISD, Hardin County, Texas. More specifically: The porous structural spray recoating of the existing track surfacing on the 8-lane running track, high jump apron, one (1) pole vault runway and two (2) long/triple jump runways. There are also at a minimum three (3) small holes in the existing surfacing that will need to be patched prior to recoating. The drainage improvements which consist of installation of 15" HDPE or RCP and 18" RCP storm sewer pipe, two storm manholes and a 10' curb inlet, from the existing field discharge pipe to the existing ditch to the west. Associated concrete pavement and demolition and repairs of pavement, curbs, striping and a bollard are also included, at a minimum. The removal and replacement of the existing synthetic turf over the existing SP14 shock pad, which is to remain. The base scope should include the removal of the existing synthetic turf, stockpiling and reinstallation of the existing shock pad, and laser grading of the turf field drain stone. The new synthetic turf system itself will be included via alternate proposals, along with potential cooling infill alternates as well as an alternate for the removal and replacement of the existing perimeter turf nailer board. Also included in the base scope shall be Powder Coating of the two (2) Existing Goalposts, including 1) the dismantling of the goalposts and transport to a local off-site powder coater, 2) powder coating in fluorescent yellow, 3) replacement of the existing hardware as provided by the manufacturer, 4) installation of new directional wind flags on the uprights and 5) the return and reinstallation of the powder-coated goalposts. Alternate #3 Turf Nailer Board Replacement shall include 1) the removal and disposal of the existing turf nailer board, and 2) the installation of a new 2x4 Black Rhino Structural Grade turf nailer board (or approved equal) with 1/2 "x4 1/2 " stainless steel Trubolt wedge anchors. Reseal the nailer with self-leveling silicone joint sealant. Alternates include different synthetic turf systems with standard rubber-sand infill, cooling infill products, and replacement of the existing nailer board. Estimated contract award date: February 8, 2024 Track Resurfacing - porous structural spray -Football/Soccer Field Turf system and infill replacement; budget assumes reusing of the pad, and cooling infill - Drainage improvements - includes new catch basin, under ground pipe, concrete repairs, asphalt repairs and fence repairs Field SF. Approx. 85,862 Track SF Approx. 49,285 Track Runways 1,600 Track Total 50,885 The location for the Pre-Submittal Conference is accessible to persons with disabilities. To arrange for special assistance to attend this meeting or if you have questions regarding accessibility, please contact the District in advance of the meeting at 409-923-7509.

Post-Bid

Playgrounds / Parks / Athletic Fields

$500,000.00

Public - City

Paving, Site Work

16

12

10

9

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
78
Active Projects
35
Bidding Soon
1,712
All Active Projects
707
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 1, 2024

April 29, 2024

img_map_placeholder

103 S Lhs Dr, Lumberton, TX

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.