Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published February 9, 2024 at 7:00 PM
Updated February 10, 2024
Site work for a water / sewer project in Waldorf, Maryland. Completed plans call for site work for a water / sewer project.
Small, Local, and Minority Business Enterprises are encouraged to respond to this solicitation. The County Commissioners reserve the right to reject any or all bids and to waive any informality in the bids received when such a waiver is in the best interest of Charles County. Charles County Government is an Equal Opportunity Employer. The Board of Commissioners for Charles County are hereby requesting sealed bids from qualified contractors to drill, construct, develop, and test the new Mattawoman-Beantown production well. There is an aspirational goal of 25% MWBE participation for each project. The site of the proposed new Mattawoman-Beantown production well is located west of the intersection of Mattawoman Drive and Mattawoman-Beantown Road in Waldorf, Maryland The primary purpose of the project is to drill, construct, develop, and test the new Mattawoman-Beantown production well which generally includes the following: A. Mobilization B. Erosion and Sediment Control Measures C. Drill Pilot Hole D. Construct, Develop, and Test New Production Well E. Furnish and Install Baker Monitor Pitless Unit F. Offsite Disposal of Drilling Fluids G. Demobilization and Site Restoration Time of Completion - (180) consecutive calendar days The work under this Contract includes all requirements to provide a fully finished and operable water well, including miscellaneous items and incidentals as shall be indicated, shown, specified or required to complete the work in strict conformity with the Contract Documents. 1. The Contractor shall provide all labor, equipment, tools, appliances, materials and incidentals, and shall perform all operations required to completely finish all of the work to the satisfaction of the Owner and the Engineer. The Contractor shall be obligated to furnish a complete and functioning facility, or the portion of the facility that they have been selected to complete. 2. The Contractor shall drill, develop and test the new production well and install the new pitless unit in accordance with the Contract requirements to achieve Substantial Completion. 3. Installation and testing of the permanent pumping equipment and abandonment of the existing production well is not included in Contract.
Bid Results
Water / Sewer
$685,700.00
Public - County
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
15
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
