Site work for a water / sewer project in Comanche, Texas. Completed plans call for site work for a water / sewer project.

As of 3/6/2024, this project has not yet been awarded. It is anticipated to be awarded in a month. Wastewater Treatment Plant Improvements The project consists of improvements to the Owner's existing wastewater treatment plant: Replacement of existing grit processing equipment; Replacement of influent grinder and spiral screening equipment; Removal and disposal of sludge from existing drying beds. The Owner reserves the right to waive any informalities and to reject any or all bids, and to accept the bid they consider most advantageous to the Owner. Bids may be held by the Owner for a period not to exceed sixty (60) days from the date of bid opening for the purpose of reviewing the bids and investigating the qualifications of Bidders prior to awarding of the contract. Award of the contract will be made as a whole to one Bidder. The contract shall be awarded to the lowest responsive, responsible bidder. Small and minority firms are encouraged to submit bids for this project. A certified check or bank draft, payable to the order of the City of Comanche, negotiable U.S. Government bonds (at par value) or a satisfactory Bid Bond executed by the Bidder and an acceptable surety in an amount equal to five percent (5%) of the total bid (Water Code 17.183) shall be submitted with each bid. The Contractor shall utilize a surety company which is authorized to do business in Texas in accordance with Surety Bonds and Related Instruments, Chapter 3503 of the Insurance Code. The party to whom the contract is awarded shall be required to furnish performance and payment bonds for 100% of the contract price, from a surety company holding a permit from the State of Texas to act as surety This contract is contingent upon release of funds from the Texas Water Development Board (TWDB). This contract is to be funded through a loan obtained from the Texas Water Development Board as part of the Clean Water State Revolving Fund. There are a number of special provisions for this funding that bidders, by submitting a bid, acknowledge understanding, including the following: Any contract or contracts awarded under this Invitation for bid (IFB) are expected to be funded in part by financial assistance from the TWDB. Neither the U.S. Environmental Protection Agency (EPA) or the State of Texas, nor any of its departments, agencies, or employees, are or will be a party to this IFB, or any resulting contract. Any contract(s) awarded under this Invitation for Bids is/are subject to the American Iron and Steel (AIS) requirements of Section 608 of the Federal Water Pollution Control Act (33 U.S.C. 1388). This contract is subject to the Environmental Protection Agency's (EPA) Disadvantaged Business Enterprise (DBE) Program, which includes EPA-approved fair share goals toward procurement of Minority and Women-owned Business Enterprise (M/WBE) businesses. EPA rules require that applicants and prime contractors make a good faith effort to award a fair share of contracts, subcontracts, and procurements to M/WBEs through demonstration of the six affirmative steps. Equal Opportunity in Employment - All qualified Applicants will receive consideration for employment without regard to race, color, religion, sex (including pregnancy), sexual orientation, gender identity, national origin, age (40 or older), disability, or genetic information. Bidders on this work will be required to comply with the Department of Labor regulations at 41 CFR Part 60-4, relating to Construction Contractors--Affirmative Action Requirements, which include the President's Executive Order No. 11246, as amended by Executive Order No. 11375 and Executive Order No. 13672, in the award and administration of contracts awarded under TWDB financial assistance agreements. Failure by the Contractor to carry out these requirements is a material breach, which may result in the termination of the awarded financial assistance. Davis-Bacon prevailing wage rates are applicable. All laborers and mechanics working on the work site and employed by contractors and subcontractors on projects funded directly by or assisted in whole or in part by and through the Clean Water State Revolving Fund or Drinking Water State Revolving Fund shall be paid wages as described in the section, Mandatory Davis-Bacon Act Contract Conditions. Davis-Bacon prevailing wage requirements apply to the construction, alteration or repair of treatment works carried out, in whole or in part, with assistance made available by the Clean Water State Revolving Fund (CWSRF) or a construction project financed, in whole or in part, from the Drinking Water State Revolving Fund (DWSRF). Any contracts in excess of $2,000 for construction, alteration or repair (including painting and decorating) and funded under the Clean Water State Revolving Fund and Drinking Water State Revolving Fund programs shall include the mandatory Davis-Bacon Act Contract Conditions. Any contracts or subcontracts in excess of $2,000 must include the provisions of the Davis-Bacon Wage Rate Requirements found in TWDB Guidance No. DB-0156. Compliance with Davis-Bacon Act and related acts and requirements apply to this project. The requirements for bidders and contractors under this order are explained in the specifications. For prime contracts in excess of $100,000, Contractors and Subcontractors must also, under the provisions of the Contract Work Hours and Safety Standards Act, as amended, pay laborers and mechanics, including guards and watchmen, at least one and one-half times their regular rate of pay for all hours worked over 40 in a workweek. The Fair Labor Standards Act may also apply to Davis-Bacon covered contracts. Doc note : Plans, Specifications, Addenda (if Any) and Project Contracting and Compliance Provisions May Be Examined at the Following Location: Jacob & Martin, Llc, 3465 Curry Lane, Abilene, Tx 79606 Bids Will Not Be Received From Contractors Who Have Not Obtained Original Plans and Specifications From Jacob & Martin, Llc. Contractor Shall Submit Only the Required Contract Documents With Their Bid. No Pre-bid Conference is Required.

Bid Results

Water / Sewer

$676,253.00

Public - City

Site Work

15

22

9

7

Subscribe For Documents

34 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
41
Active Projects
22
Bidding Soon
845
All Active Projects
336
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 25, 2024

February 26, 2024

img_map_placeholder

To Be Determined, Comanche, TX

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.