Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Fountain, Colorado. Completed plans call for site work for a water / sewer project.
Reference Number 0000338923 Replace existing sanitary sewer line with new line. Any contractors that have not worked with Fountain Sanitation District before must show sanitary sewer line construction examples. Remove and replace approximately 452-feet +/- of 8" dia. Vitrified Clay Pipe (VCP) with an 8" dia. SDR-35 pipe. An estimated eleven (11) service lines will have to be reconnected to the proposed pipe. The inverts of two (2) existing manholes will need to be modified to accept a new water-tight seal for the PVC pipe. Question Acceptance Deadline 02/02/2024 at 4:00 PM MT Questions are submitted online No -- Submit all questions about the Drawings or Specifications to the Engineer in writing. No pre-bid meeting will be required. All existing sanitary sewer pipe removed during construction is the responsibility of the contractor to dispose of. 2) Contractor responsible for all asphalt damaged or removed during construction per city of fountain requirements. 3) Fountain Sanitation District has not located any underground utilities, this will be the responsibility of the contractor before digging. 4) Contractor is responsible for a traffic control plan that meets the city of Fountain requirements. 5) Contractor is responsible for all erosion control measures. 6) Contractor is responsible for pumping sanitary sewer flows from the upstream ex. manhole to the down stream ex. manhole, as well as any service line flows. 7) Contractor must submit compaction tests per FSD specs. prior to paving. 8) Existing manholes to remain, contractor responsible for modifications to the pipe entry points on the manholes to ensure a water tight seal. 9) Pavement thickness needs to match existing conditions or min. 5", whichever is greater, over 24" of aggregate base course. The base course is required regardless of the asphalt thickness determined. 10) Reattach ex. 4" sanitary sewer services lines with wye saddle tap within the trench. 11) All sanitary sewer service line grades to remain. 12) No pipe air test nor manhole vac test will be required. however, contractor responsible for video of pipe after construction for final approval. 13) Contractor responsible for geotech testing Each bid must be accompanied by a Bid Bond payable to the Owner for five percent of the total amount of the bid on the form provided herewith. When the Agreement is executed, the bonds of the unsuccessful bidders will be returned. The Bid Bond of the successful bidder will be retained until the Payment Bond and Performance Bond have been executed and approved, after which it will be returned. A certified check may be used in lieu of a Bid Bond. A Payment Bond and a Performance Bond, each in the amount of 100 percent of the contract price, with a corporate surety approved by the Owner, will be required for the faithful performance of the Contract on the forms provided by the Owner Submit all questions about the Drawings or Specifications to the Engineer in writing no later than three (3) days prior to the time set for receipt of bids. Corrections or clarifications shall be made by Addendum. Oral clarifications will not be binding.
Bid Results
Water / Sewer
$155,842.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 7, 2024
March 8, 2024
Kiowa St, Fountain, CO
Related To This Project
Fountain, CO
Bid Date: Sep 10 2020
Fountain, CO
Bid Date: Jan 26 2024
Fountain, CO
Bid Date: Jan 15 2020
Fountain, CO
Bid Date: Feb 05 2024
Fountain, CO
Bid Date: Feb 09 2024
Fountain, CO
Bid Date: Mar 13 2024
Fountain, CO
Bid Date: Mar 20 2024
Fountain, CO
Bid Date: Jun 13 2024
Fountain, CO
Bid Date: Feb 14 2024
Fountain, CO
Bid Date: Jan 19 2024
Fountain, CO
Bid Date: Jan 17 2024
Fountain, CO
Bid Date: May 09 2024
Fountain, CO
Bid Date: Dec 08 2023
Fountain, CO
Bid Date: Jan 04 2024
Fountain, CO
Bid Date: Dec 11 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.