BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a clubhouse / community center in Lake Alfred, Florida. Completed plans call for the renovation of a clubhouse / community center.

**As of March 6, 2024, the project was awarded to Grove Construction, with an awarded amount of $44,755.26.** Restroom Renovation The City of Lake Alfred will be using CDBG funds to focus on improving the Highlands Community Center to incorporate the needs of low to moderate-income individuals and families in the community. The current restroom located at the Highlands Community Center does not meet ADA standards and this project will increase access to the public facility to incorporate the needs of all individuals utilizing this facility. All equipment and installations will adhere to the 2010 ADA Standards for Accessible Design, the 2012 Florida Accessibility Code for Building Construction, and the City of Lake Alfred Building Code. Widen or remove the hallway wall to provide access to restrooms. Demo and remove all existing restroom components to bare walls/ceiling before the commencement of new construction. Install all new plumbing and any new electrical wiring as necessary. Install new exhaust ventilation in both bathrooms including controls, ductwork, and roof. Insulate the interior walls in both restrooms prior to the installation of new sheetrock. Install all new ADA equipment in both toilet rooms: one white toilet, one white sink with lever-style hardware, a 36 grab bar, a 42 grab bar, mirror, paper towel dispenser, soap dispenser, toilet paper dispenser, sink insulation, a coat hook, threshold, waste receptacle, ADA signage, a new door with lever-style hardware and privacy latch. Replace existing lighting with LED lighting in both restrooms. Replace existing light switches with automatic light sensors. Tile the restroom floors with tile choice approved by the City of Lake Alfred. Tile from the floor up to 11/2 of the wall with tile choice approved by the City of Lake Alfred. Finish the remaining drywall. Drywall paint color and quality shall be approved by the City of Lake Alfred. Mitigate any other unforeseen elements or components For more information, please do not hesitate to contact John Deaton, Public Works Director at (863) 298- 5458 The City reserves the right to reject any and all bids, to waive informalities, to readvertise and to accept the bid in the best interest of the City, not necessarily the lowest bid.

Award

Clubhouse / Community Centers

$44,755.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
139
Active Projects
71
Bidding Soon
1,479
All Active Projects
626
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 6, 2024

March 7, 2024

img_map_placeholder

655 N 3rd St, Lake Alfred, FL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.