Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published March 25, 2024 at 8:00 PM
Updated March 27, 2024
Site work and asbestos abatement for an educational facility in Rochester, Minnesota. Completed plans call for site work for a educational facility; and for asbestos abatement for a educational facility.
The scope of work for Phase 1 involves the removal, under full containment and utilizing wet-grinding methods, of approximately nine hundred (900) square feet of asbestos-containing floor tile and mastic beneath non-asbestos containing carpet in Room 109 [see Appendix B for ASB100, AD100.b AD300, MD100.b, and PD101b for schedule of materials to be removed]. The scope of work also includes the removal of carpet, which may take place once full containment has been established, prior to any disturbance of asbestos-containing materials. Carpet may be disposed of as non asbestos containing waste if asbestos-containing floor tile and/or mastic is not adhered to the carpet. The scope of work also includes, under full containment, the removal of asbestos-containing plaster wall texture (estimated two hundred seventy [270] square feet) utilizing wet-grinding methods, on the north exterior wall. A. The Project consists of the removal of asbestos containing ceiling and wall sprayed-on structural fireproofing texture, mudded pipe fitting insulation, plaster soffit and wall texture, Transite paneling, air-handling unit caulk, duct sealant caulk, floor tile and mastic throughout the building. 1. Project Location: Kellogg Middle School 2. Owner: Rochester Public Schools B. Contract Documents, dated January 9, 2024, were prepared for the Project by Natalie Eskew. Kellogg MS Asbestos Removal
Award
Educational
$290,660.00
Public - City
Asbestos Abatement, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 6, 2024
March 28, 2024
503 17th St NE, Rochester, MN
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
