Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in Rockford, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; water / sewer project; sidewalk / parking lot; and sidewalk / parking lot.
This report presents the results of a subsurface exploration for the roadway reconstruction project planned for Whitman Street and various side streets in Rockford, Illinois. The purpose of this report was to determine and evaluate the subsurface conditions existing at the subject site, and to establish related geotechnical parameters to be utilized for the economical design and construction of the proposed pavement improvement project referenced above. Authorization to perform this subsurface exploration and analysis was provided in the form of signed purchase order No. 18179 by the current Central Services Manager of the City of Rockford. DESCRIPTION OF WORK - ROADWAY: The City of Rockford requests bids from qualified companies to provide all labor, materials, equipment, and supplies necessary for the Whitman Street Reconstruction project as described in these specifications. The work consists of the reconstruction of the roadway section. Additional work will include pavement, sidewalk and curb and gutter removal, aggregate base courses, intersection improvements including traffic signals, pcc sidewalk, ADA ramps, combination concrete curb and gutter, driveway reconstruction, storm sewer installation, utility improvements (excluding water main), pavement marking and signing, erosion control, landscaping, and all incidental and collateral work necessary to complete the project as shown on the plans and as described herein. The Whitman Street Reconstruction project is divided into two phases: Phase 1 and Phase 2. Phase 1 is further broken down into three sub-phases, Phase 1a, Phase 1b and Phase 1c. Phase 1a begins at the far west end of the project, near Underwood Street and ends at the west leg of Kilburn Avenue, minus the omission station range near the railroad. Phase 1b begins at east leg of Kilburn Avenue and ends at the west leg of N Rockton Avenue. Phase 1c begins at the west leg of N Court Street and ends at the eastern limits of the project. All of Phase 1 must be completed and fully open by November 1st, 2024. Phase 2 begins at the west leg of N Rockton Avenue and ends at the west leg of N Court Street. Work on Phase 2 must not commence until Phase 1 is complete, unless directed by the Engineer. All of Phase 2 must be completed and fully open by October 15th, 2025. 1.2a DESCRIPTION OF WORK - WATER MAIN REPLACEMENT :The City of Rockford requests bids from qualified companies to provide all labor, materials, equipment, and supplies necessary for Whitman Street Phase One Water Main Replacement as described in the Section 4 Special Provisions. This work consists of replacing existing 4", 6", and 12" water main, valves, services, and associated appurtenances; and installation of new 8" and 12" ductile iron main, valves, services, hydrants, and associated appurtenances. The 8" water main is to be installed in School Street from North Avon Street to Kent Creek and from Lee Street to Kilburn Avenue; and in Whitman Street from North Rockton Avenue to North Winnebago Street, and Haskell Avenue to North Court Street. The 12" water main is to be installed in the intersection of North Church Street and Whitman Street. Connections to existing water mains and the required water main sizes can be seen in the plan set. Several bid items are not anticipated to be used and have been included for the purpose of obtaining unit price should these items be required by field conditions. Reasonable effort has been made to ensure that the bid quantity breakdown sheets are accurate, however, quantities in the breakdown sheets are provided only as a courtesy for bidding and are subject to change by the owner. Vendor must begin within ten (10) days of notice to Proceed. Vendor will have until October 25, 2024 to complete Phase 1 of the project. Vendor will have until October 24, 2025 to complete Phase II of the project. Each bidder shall submit with his bid the information specified in the bid documents for compliance with the laws of the State of Illinois on Fair Employment Practices and with the City of Rockfords Ordinance on Equal Employment and Business Opportunity. When required on the cover sheet, a bid bond for not less than five (5) percent of the bid amount must accompany all bids as a guarantee that if the bid is accepted, the bidder will execute and file the proper contract. A bank cashiers check, bank draft, or certified check equal to the amount specified is acceptable in lieu of a bid bond. Bid bonds of the two lowest firms will be retained until the contract is awarded. When required by the specifications herein, the awarded vendor shall furnish a performance and payment bond equal to the amount of the contract, acceptable to the City, within fourteen (14) calendar days after notification of contract award. Failure to furnish the required bond within the time specified may be cause for rejection of the bid and any bid deposit may be retained by the City as liquidated damages and not as a penalty PLEASE MARK THE RETURN SEALED ENVELOPE: 1. Bid Opening Date and Time 2. Title of Job 3. Bid Number PLEASE DO NOT USE STAPLES TO BIND THE BID RESPONSES. Bid results may be obtained by telephone at 779-348-7164 or Electronically Last Day for Questions: January 26, 2024 at 12.00 PM Questions regarding this Bid/RFP shall be addressed to: Dajana Glisic - dajana.glisic@rockfordil.gov Any bidder attempting to deliver after the opening time and date will be refused. All questions regarding the bidders preparation of this bid, pertaining to the drawings and specifications, shall be compiled in writing and e-mailed to Anne Wilkerson, (anne.wilkerson@rockfordil.gov) City of Rockford, Finance Department, at least 72 hours prior to bid time. Questions received less than 72 hours before the designated bid time cannot be answered by addendum. Oral statements will not be binding to City of Rockford or Vendor. Any questions deemed by City as requiring a response will be answered by addendum issued to all bidders and will become a part of the Contract. Subcontractors must direct their questions through Vendor only. The consulting Architect and/or the consulting Engineer shall not be contacted direct without prior authorization from City. Answers to Questions will be Posted in the form of an Addendum no Later than January 30,2024 Regardless of cause, late bids and proposals will not be accepted and will automatically be disqualified from further consideration. It shall be solely Vendor's risk to ensure delivery at the designated office by the designated time. Late bids and proposals will not be opened and may be returned to Vendor at their request and expense. Any bid which fails to include the compliance items properly completed will not be read and will not be considered. All Contracts for the Construction of Public Works are subject to the Illinois Prevailing Wage Act (820 ILCS 130/1-12). The City of Rockford reserves the right to accept or reject any and all proposals and to waive technicalities. The City of Rockford reserves the right to accept or reject any or all bids or proposals at any time, for any reason, including but not limited to the Rockford City Council not appropriating sufficient funds to purchase equipment or complete the contract. The City may make awards in any manner deemed in the best interest of the City.
Award
Roads / Highways
$9,614,440.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 2, 2024
April 2, 2024
Whitman St, Rockford, IL
Related To This Project
Rockford, IL
Bid Date: Feb 02 2024
Rockford, IL
Bid Date: Jan 25 2024
Rockford, IL
Bid Date: Jun 21 2021
Rockford, IL
Bid Date: Feb 07 2024
Rockford, IL
Bid Date: Jan 29 2024
Rockford, IL
Bid Date: Feb 13 2024
Rockford, IL
Bid Date: Feb 06 2024
Rockford, IL
Bid Date: Feb 02 2024
Rockford, IL
Bid Date: Feb 01 2024
Rockford, IL
Bid Date: Jan 30 2024
Rockford, IL
Bid Date: Feb 02 2024
Rockford, IL
Bid Date: Feb 13 2024
Rockford, IL
Bid Date: Jan 17 2024
Rockford, IL
Bid Date: Jan 08 2024
Rockford, IL
Bid Date: Jan 17 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.