BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 12, 2024 at 7:00 PM

Updated February 13, 2024

Site work for an educational facility in Las Vegas, Nevada. Completed plans call for site work for a educational facility.

West Charleston Monument Signage Bids must be accompanied by a bid bond in the amount of five percent (5%) of the bid amount ("Bid Security") Please submit any questions or requests for additional information through the NGEM question tab. Responses to inquiries will be through the NGEM system. The summary of work includes the new monument sign will be constructed on Assessor's parcel Number (APN): 163-02-501-002, which is zoned C-V. There will be no off-site work required for the sign. The scope of work will encompass approximately 4,600 s.f., which will include the 227 s.f. for the sign footprint and the landscape improvements around it. the sign will have a vertical wall (overall height of 20'-5") with the campus logo that will be clad in phenolic resin panels, and low walls (overall height 5'-10") with the name of the campus and the address. the low wall is to be clad in travertine. WITHDRAWAL OF BID Any prospective bidder may request withdrawal of a posted, sealed bid prior to the scheduled bid opening time provided the request for withdrawal is submitted to the Purchasing Department in writing, or presents themselves in person with proper identification to the Purchasing Department and verbally requests the bid be withdrawn and signs for its receipt. ACCEPTANCE PERIOD The Bidder agrees to a minimum of 120 calendar day acceptance period from the date of public opening. The College of Southern Nevada (CSN), Facilities Management Department is requesting bids for a turn-key project to construct a new monument sign at the West Charleston Campus. The selected Contractor will be entirely responsible for the completion of the project. The anticipated period of performance for this project is to be completed no later than 90 days from the notice to proceed. Liquidated Damages in the amount of $500.00 per day will be levied for each day the project is not completed after the required Project Completion Date.

Post-Bid

Educational

$700,000.00

Public - State/Provincial

Site Work

48

5

2

2

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
65
Active Projects
35
Bidding Soon
362
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 9, 2024

March 11, 2024

Project location map

6375 W Charleston Blvd, Las Vegas, NV

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.