BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 5, 2024 at 7:00 PM

Updated February 6, 2024

Renovation of a municipal facility in Los Alamos, New Mexico. Completed plans call for the renovation of a municipal facility.

Opportunity Amount: $6,000,000.00 to $7,500,000.00 USD The purpose of this project is to prepare the Strategic Computing Complex's electrical distribution system to support the future peak power requirements of the National Nuclear Security Administration (NNSA) and Advanced Simulation and Computer (ASC) program through 2031. The objective of the project is to install the necessary electrical gear and equipment to increase the electrical distribution system at the SCC. This project will take the 20MW power distribution being provided by the Electrical Power Capacity Upgrade project from the outside switchgear and distribute it within the facility up to the secondary switchgear. In general, this includes, new 2500/3750kVA oil-filled transformers, overhead bus, and structure located on the south side of the building. This will require modifications to the existing security fence, access road, and walk pathway. Civil Site-work will include drainage modifications. New secondary low-voltage switchgear will be installed in the free space Room 1400A. The project will be required to consider the necessary modifications to the existing fire alarm and suppression systems because of new equipment and conductor runs. Power monitoring systems shall be installed as well as an emergency power off system. per the construction documents, provide the necessary modifications to locate and install two new electrical manholes, sic new outdoor 3750kVA oil-filled transformers (GFE) and associated underground duct banks from the manholes to the transformer pad locations. Most of the south-side security fence will be demolished and replaced to accommodate the new equipment. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Municipal

$7,000,000.00

Public - Federal

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
40
Active Projects
26
Bidding Soon
326
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 2, 2024

April 3, 2024

Project location map

Multiple Locations, Los Alamos, NM

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.