BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Auburn, Maine. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The following scope of work is being proposed for the 2024 Pavement Resurfacing Project for the City of Auburn. The scope of work is a brief overview of the expected extent of work on each street included in this contract. This is only a proposed scope with associated estimated quantities. Items, extent and entire streets may be added or deleted as work progresses or to meet the available funding for this work. Questions regarding this Request for Bids should be directed to Adam Stevens, Project Manager, at (207) 333-6601, ext. 1140 The City of Auburn is accepting written proposals for the Engineering Department's 2024 Pavement Resurfacing Project. The City reserves the right to accept or reject any or all proposals in whole or in part and to waive any informality the City may determine necessary. The City also reserves to itself the exclusive right to accept any proposal when it is deemed by the City to be in its best interest. The City of Auburn is governed by Title 1 M.R.S.A. 401-410, otherwise known as the Freedom of Information Act, which considers bid specifications as public documents. In awarding any proposal, the City may consider, but not be limited to, any of the following factors: Bidder qualifications, price, experience, financial standing with the City, warranties, references, bonding, delivery date, and service of Bidder. Vendors/Contractors shall be current on all amounts due to the City of Auburn prior to the City entering into any contract agreement. All proposals must include FOB to Auburn, Maine unless otherwise specified. Proposals will not receive consideration unless submitted in accordance with the following instructions to bidders. Please mark sealed envelopes plainly: "2024 Pavement Resurfacing Project-Bid #2024-020. SCOPE OF WORK The following scope of work is being proposed for the 2024 Pavement Resurfacing Project for the City of Auburn. The scope of work is a brief overview of the expected extent of work on each street included in this contract. This is only a proposed scope with associated estimated quantities. Items, extent and entire streets may be added or deleted as work progresses or to meet the available funding for this work. Shim and Overlay Existing Pavement Surface The following locations will be shimmed with 9.5mm HMA and overlaid with approximately 1.5" of 12.5mm HMA. Butt joints will be ground at intersecting streets and driveway openings where applicable. Installing 3/4 " shoulder gravel at 18" width will be included in this contract. Maple Hill Road - Lake Shore Drive to Beaver Road o Existing dimensions: 22' x 7055' o Back up new driveway pavement with gravel or loam and seed to match existing material o Ditching as directed o Install concrete curb, mold 3, starting at 375 Maple Hill Road and extending to 325 Maple Hill Road o Install 6" UD Type B from the address's above daylight in the ditch just south of 325 Maple Hill Road South Witham Road - Penley Corner Road to Sopers Mill Road o Existing dimensions: 20' x 7770' o Back up new driveway pavement with gravel or loam and seed to match existing material o Ditching as directed Holbrook Road - North Auburn Road to Minot Town Line o Existing dimensions: 22' x 5770' o Back up new driveway pavement with gravel or loam and seed to match existing material o Ditching as directed o Add gravel and pave 3 turnout areas o Stripe centerline full length Wilson Hill Road - Turner Town Line to Minot Town Line o Existing dimensions: 23' x 1660' o Back new driveway pavement with gravel or loam and seed to match existing material o Ditching as directed Bailey Road - Wilson Hill Road to Minot Town Line o Existing dimensions: 23' x 1915' o Back up new driveway pavement with gravel or loam and seed to match existing material o Ditching as directed Work Hours No work shall proceed on this project prior to the hour of 7:00 AM or after 7:00 PM (prevailing time) on any working day unless the City has granted prior approval. The definition of work for this specification shall include starting or moving of equipment, machinery, or materials. Any day worked for four hours or more will be considered a full working day. Questions from prospective bidders relative to this Contract shall be submitted no later than five days before bid opening (4:00pm Friday January, 19) and directed to: Adam Stevens Project Manager Engineering Department Tel. 333-6601 ext. 1140

Bid Results

Roads / Highways

$919,332.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
95
Active Projects
50
Bidding Soon
990
All Active Projects
259
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

January 25, 2024

February 26, 2024

September 30, 2024

img_map_placeholder

Multiple Locations, Auburn, ME

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.