BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Palmdale, California. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

This project will be the fifth phase in the series of North County ITS projects to construct fiber optic interconnect, CCTV surveillance, Traffic Operations Center (TOC) upgrades, and new/upgraded signals within the City. The North County ITS Phase V Project will provide a fiber optic interconnect on Tierra Subida/Rayburn Drive, Tierra Subida/Avenue S, and at Elizabeth Lake Road and 25th Street West. A new hub will be located at Tierra Subida/Avenue S and used to land and jumper new and existing fiber optic cables. The existing cable on Avenue S will be re-routed into the new hub. The new fiber will enable a new communications circuit between the Traffic Operations Center and existing traffic signals at Avenue S/The Groves and Avenue S/Parkwood Drive; and provide splice points and slack in the cable for tie-in of future traffic signal locations and other interties. In addition to the fiber optic infrastructure, the project will include replacing an existing 4-way stop sign and flashing beacon assembly with construction of a new traffic signal at Avenue N/60th Street West. The work at this intersection will include fully improved curb returns on the Northwest and Southwest corners placed as far back as existing right-of-way will allow (in order to place conduits and pull boxes in their ultimate location); transition from the new curb returns back to existing pavement; implementation of an Eastbound left-turn lane and transitions, temporary traffic control plan development; temporary traffic control implementation and maintenance; public notification and convenience; construction surveying and staking; erosion control plan / SWPPP preparation and implementation; earthwork; street demolition; street improvements including mill and overlay, leveling courses, and street widening; street drainage improvement, and furnishment and installation of all appurtenances; utility coordination; utility adjustments and improvements; and signing and striping improvements. Finally, the project will evaluate 4 traffic signals for additional CCTV cameras, including analysis to determine the optimum location for the cameras. License Requirements Class A Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Online Q&A Yes Q&A Deadline 01/29/2024 2:00 PM (PST) Liquidated Damages $1,000 per calendar day Estimated Bid Value $4.5 million Start/Delivery Date Start construction in March. 2024 (estimate only) Project Duration 140 working days

Award

Roads / Highways

$7,095,123.00

Public - City

Paving, Site Work

46

11

2

5

Subscribe For Documents

73 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
221
Active Projects
99
Bidding Soon
2,209
All Active Projects
984
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 6, 2024

April 8, 2024

img_map_placeholder

Multiple Locations, Palmdale, CA

Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.