BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving, renovation and addition to a mixed-use development in Edwardsville, Illinois. Completed plans call for the addition of a 8,000-square-foot educational facility; for the demolition of a educational facility; for the renovation of a educational facility; for site work for a educational facility; for paving for a educational facility; water / sewer project; water / sewer project; water / sewer project; and water / sewer project.

Bids Shall Be Clearly Marked With "Cusd #7 High School Commons Expansion" and Appropriate Bid Package Number, Name of Bidder, and Date and Time of Bid Opening. Faxed and/or Emailed Bid Proposals Will Not Be Accepted and Bids Received After Stated Time Will Not Be Accepted and Will Be Returned Unopened. No Immediate Decision Shall Be Rendered Concerning the Bids Submitted. After the Bids Have Been Tabulated and Evaluated, They Will Be Presented to the Board of Education. Project Description Work Involves Select Site Demolition, Select Building Demolition, Sitework Activities and the Construction of a New Commons Addition That Will Expand the Existing Commons. Work Also Includes the Partial Renovation of the Existing Commons Spaces and the Full Renovation of an Existing Bank of Restrooms Located Near the Existing Commons Items Currently Bidding Bids Will Be Received for the Following Bid Packages. See Specific Scope of Work for Specification Inclusion and Responsibility. Generally, the Work May Be Described as Follows: 1. Bid Package No. 02 - Demolition 2. Bid Package No. 03 - Concrete and Site Concrete 3. Bid Package No. 04 - Masonry & Stone 4. Bid Package No. 05 - Structural Steel and Miscellaneous Steel/metals 5. Bid Package No. 06 - Carpentry, Rough Carpentry 6. Bid Package No. 7.0 - Roofing, Sheetmetal and Metal Wall Panels 7. Bid Package No. 7.2 - Fireproofing and Intumescent 8. Bid Package No. 08 - Aluminum Entrances, Storefronts & Glazing 9. Bid Package No. 9.1 - Metal Studs / Drywali / Acoustical Ceilings 10. Bid Package No. 9.6 - Flooring 11. Bid Package No. 9.7 - Resinous Flooring 12. Bid Package No. 9.9 - Painting & Coatings 13. Bid Package No. 11 - Food Service Equipment 14. Bid Package No. 21 - Fire Suppression System 15. Bid Package No. 22 - Plumbing 16. Bid Package No. 23 - Heating, Ventilation and Air Conditioning 17. Bid Package No. 26 - Electrical Work 18. Bid Package No. 31 - Earthwork, Site Clearing, Erosion Control/swppp, Storm Sewer & Landscaping This Meeting is Not Mandatory but It is Strongly Recommended That All Prospective Bidders Attend. All Attendees Can Park in the Visitor Lot Near the Main Entrance to the High School. Classes Will Not Be in Session. Meet Inside the Main Entrance at the South Side of the Building. The Meeting Will Consist of General Discussion of the Project & Bidding Requirements as Well as a Walk of the Area(S) Where the Scope of Work is Occurring. Contract Type Bids Will Be Based on Multiple Bid Packages. See Specific Scope of Work for Specification Inclusion & Responsibility. Generally, the Work May Be Described as the Packages Listed Above. Bids Shall Include Not Less Than the Prevailing Hourly Wage Rate Determined by the Illinois Department of Labor. Bid Stipulations a Bid Bond or Certified Check Made Payable to Board of Education Edwardsville Cusd #7, in the Amount of 5% of the Base Bid Shall Accompany the Bid as a Guarantee That the Bidder, if Awarded the Contract, Will Execute the Contract and Proceed With the Work. Bidders Are Required to Complete the Bid Form Provided. Sealed Bids Must Include: Bid Security and Completed Bid Form. All Bids Must Be Submitted in Duplicate. The Board of Education Edwardsville Cusd #7 Reserves the Right to Accept or Reject Any or All Bids, and to Waive Any Informality in the Bidding Process. Bidders Must Be in Compliance With the Rules and Regulations of the Fair Employment Practices Commission. It is the Statutory Policy of the State of Illinois That Contractors and Subcontractors Shall Pay Prevailing Wages Pursuant to the Wages of Employees on Public Works Act (820 Ilcs 130/1 Et Seq.). No Bids May Be Withdrawn After the Opening of Bids, Without the Consent of the Owner, for a Period of Ninety (90) Days Thereafter." *Addendum #6 has now been posted. This addendum includes the meeting minutes from the pre-bid walkthrough and associated sign-in sheet from 4/10. Please take note, we are now past the RFC date and bids are due at 2:00 p.m. on 4/18.

Award

Educational

$6,800,000.00

Public - State/Provincial

Addition, Demolition, Paving, Renovation, Site Work

73

1

40

4

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
223
Active Projects
98
Bidding Soon
1,508
All Active Projects
657
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

April 18, 2024

July 15, 2024

img_map_placeholder

6161 Center Grove Rd, Edwardsville, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.