Demolition, site work and new construction of a mixed-use development in Pecos, Texas. Completed plans call for the demolition of a educational facility; for site work for a educational facility; for the construction of a 47,510-square-foot educational facility; and 1,018-square-foot educational facility.

This is the second of a multi-package project consisting of the demolition, reconstruction, and renovation of Pecos High School in Pecos, Texas. Please see below for a breakdown of all packages and associated work for this project. Each package will be bid separately, as the entire project is phased over a five-year duration. This project consists of the construction of a new 47,510 sf Field House and a new 1,018 sf Softball Concession Building for Pecos-Barstow-Toyah ISD in Pecos, Texas. Please refer to the list of Proposal Packages out for bid below for specific trade work included in the project. Bidders will provide one lump sum bid for all work in the project. Accounting-only breakouts will be requested between the Field House and Softball Concession Building. Bidders are required to submit BTC trade-specific bid forms and scope of work reviews. These forms will be posted no later than Wednesday, May 15, 2024. Company letterhead quotes are welcome but must be attached to a BTC bid form and scope review form. Construction Budget: $37,106,801 Construction Duration: 24 Months Lead Estimator: Brian Rhoades 817-781-6397 brhoades@btcbuilds.com Preconstruction Schedule: Invitations to Bid Issued 5/2/2024 Substitution Requests Deadline 5/14/2024 Pre-Bid Meeting 5/14/2024 - 9:00 AM (CT) RFI Deadline 5/15/2024 Scope Reviews Posted (NLT) 5/15/2024 Final Addendum Posted (NLT) 5/17/2024 Bid Date 5/22/2024 - 2:00 PM (MT) BTC Notice to Proceed 6/18/2024 Project Substantial Completion: 6/30/2026 Question Deadline 05/15/2024 RFI requests are limited to a request for interpretation or clarification of the requirements of the Contract Documents. Interpretations provided by the Architect shall not change the requirements of the Contract or the Contract Documents. If the Contractor determines that the Architect's response to an RFI gives cause for a change in the Contract or the Contract Documents, the Contractor shall promptly, within 5 working days, give written notice to the Architect of request for adjustments.

Post-Bid

Educational

$37,106,801.00

Public - City

Demolition, New Construction, Site Work

428

72

121

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
5
Active Projects
5
Bidding Soon
73
All Active Projects
29
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 22, 2024

June 18, 2024

img_map_placeholder

1201 S Park St, Pecos, TX


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.