Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published February 16, 2024 at 7:00 PM
Updated February 17, 2024
Site work for a civil project in Norwood, Massachusetts. Completed plans call for site work for a water / sewer project.
Ellis Pond Dam Repair. Work will include: Clean and Inspect Toe Drain, Reset Toe Drain Pipe at Outfall, Reset Toe Drain at Clean Out, Exercise Low-Level Outlet Gates, Remove and Cover Cables at the Auxiliary Spillway. Site Description Ellis Pond Dam (National ID MA00805/State ID 6-11-220-1), as shown on Sheet 1.0 of Appendix A, is a 400-foot long dam that consists of four major elements; the earthen embankment, the primary spillway, the low-level outlet, and the auxiliary spillway. The earthen embankment at Ellis Pond Dam is separated into two sections - a short, approximately 55-foot long section located right of the primary spillway and a 210- foot long section located between the primary and auxiliary spillways. The dam has a total structural height of approximately 16.5 feet and a hydraulic height of approximately 13 feet. The upstream side of the embankment is sloped at approximately 2.5H:1V and protected by stone riprap. The upper two to three feet of the riprap along the section of the embankment between the spillways is filled with concrete. The crest between the auxiliary spillway and primary spillway is about 20 feet wide and is grassed with a 6-foot-wide stone dust walking path along the centerline. The crest from the primary spillway to the right abutment is a stone dust-covered parking area. The downstream slope of the dam is grass covered with an average slope of approximately 3H:1V. A toe drain system that includes a 6-inch slotted PVC pipe runs along the toe of the downstream slope. Discharges from the toe drain exit through a concrete outlet structure with a v-notch weir that is located on the left side of the primary spillway discharge channel. A cleanout for the toe drain is located on the left abutment near the downstream edge of the crest. The following descriptions of the primary spillway and low-level outlet are paraphrased from the combined Emergency Action Plan (EAP) and Operations and Maintenance Manual (O&M) prepared by Fay, Spofford & Thorndike:
Bid Results
Water / Sewer
$117,445.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 15, 2024
March 11, 2024
430 Walpole St, Norwood, MA
Related To This Project
Norwood, MA
Bid Date: Feb 22 2024
Norwood, MA
Bid Date: Feb 29 2024
Norwood, MA
Bid Date: May 23 2024
Norwood, MA
Bid Date: May 23 2024
Norwood, MA
Bid Date: Mar 15 2024
Norwood, MA
Bid Date: Mar 11 2024
Norwood, MA
Bid Date: Mar 22 2024
Norwood, MA
Bid Date: Mar 21 2024
Norwood, MA
--
Norwood, MA
Bid Date: Dec 21 2023
Norwood, MA
Bid Date: Jan 23 2024
Norwood, MA
Bid Date: Jan 31 2022
Norwood, MA
--
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed