BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 26, 2024 at 8:00 PM

Updated August 28, 2025

Site work and new construction of a mixed-use development in Norwood, Massachusetts. Completed plans call for the construction of a swimming pool; for site work for a swimming pool; and water / sewer project.

Pool Pump Building construction. Estimated Cost $750,000 Horizontal construction project for pool building going out at the same time. The contractor shall furnish labor and materials to install an accessory building to the Hawes Pool. The building serves as a pumping system to supply adequate water for pool usage.

Bid Results

Water / Sewer

$896,000.00

Public - City

New Construction, Site Work

40

21

34

12

Subscribe For Documents

72 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
603
Active Projects
318
Bidding Soon
4,381
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 23, 2024

June 24, 2024

Project location map

1305 Washington St, Norwood, MA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.