BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Burnsville, Minnesota. Design plans call for the renovation of a 209,826-square-foot fire / police facility; and municipal facility.

As part of Access Burnsville, the city is planning the City Hall/Police Station remodel, renovation and expansion. Access Burnsville will more than double the physical space available for police, city staff and the community. The City Hall-police project is tentatively planned to begin construction in May 2025 and completed in January 2028. Project bidding expected December 2024-January 2025 Invest in existing site and facility: upgrade existing HVAC, lighting, technology, and security infrastructure to address deficiencies, improve efficiency, and coordinate with new work; provide a two-story expansion on the northeast side (internally referred to as the north side) to facilitate location of all public service departments at the main level, and to accommodate Police Department expansion into the lower level of City Hall. Explore relocation of the council chambers to support a more direct and welcoming public entry and service desk arrangement, with expanded public meeting rooms, while also providing the council chambers with natural lighting, council egress for safety, and dedicated and adaptable control and broadcast rooms. The proposed expansion utilizes the most efficient location; should addition future growth be required, there is the potential for more modest scale expansions to the northwest and southeast, though these would not accommodate significant program growth. Invest in existing site and facility, maximizing utilization and capacity to respond to program projections: upgrade existing HVAC, lighting, technology, and security infrastructure to address deficiencies, improve efficiency, and coordinate with new work; expand the vehicle garage and adjust the site parking in response; provide interior reconfiguration and adaptation of the existing main level to consolidate key program elements into contiguous spaces for each use; leverage space at City Hall’s lower level for dedicated training facilities; expand the lower level gun range and utilize the same footprint at the upper level for administrative expansion. This facility is landlocked: i.e. constrained by site features, so proposed investments will approximate 20-year space need projections while utilizing the remainder of the site, with no further capacity for growth or expansion.

Design

Fire / Police

$97,180,000.00

Public - City

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
131
Active Projects
69
Bidding Soon
1,658
All Active Projects
573
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

May 1, 2025

January 3, 2028

img_map_placeholder

100 Civic Center Pkwy, Burnsville, MN

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.