BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition and site work for a water / sewer project in Palm Bay, Florida. Completed plans call for the demolition of a water / sewer project; and for site work for a water / sewer project.

PROJECT DESCRIPTION All Work for the Project shall be constructed in accordance with the Drawings and Specifications. The Work generally involves: 1) Demolition of existing pressure treated wood. 2) Disposal of existing pressure treated wood according to all statutes and environmental requirements. 3) Rebuilding the decking and structural cross members utilizing existing pilings. The footprints of the piers shall not change. 4) Wood shall be: a) All structural lumber shall be a minimum Number #1 Dense Select Structural or #1 Southern Prime Southern Yellow Pine Ca- .25 Treatment For decking, Railing, Cap Board, Posts TYP. b) Inspected and approved by owner for compliance and visual uniformity prior to installation. Any or all wood disapproved by owner will be immediately removed from jobsite by contractor, at Contractors expense. This project is a turnkey project from start to finish; furnish and install all items for all work identified in the project plans and bid specifications and all cost associated with the construction shall be included with the line items provided. No additional compensation for the work identified will be provided, unless authorized by the City through a valid change order. This project is being funded partially through a Florida Inland Navigation District (FIND) grant. ***Bid event: The public record of the preliminary bid results as read at the public opening can also be requested by calling 321-952-3424 or emailing procurement@pbfl.org. To attend in person, interested parties should check in at the Information Desk in Building A to be escorted to this meeting. 1. Submitted electronically via the City of Palm Bays Vendorlink website. 2. Irrevocable after the time and date for the opening of Bids and for a period of ninety (90) days thereafter. Finally completed on the Final Completion Date and ready for final payment in accordance with this Agreement within Seventy-Five (75) calendar days

Award

Water / Sewer

$146,165.00

Public - City

Demolition, Site Work

5

7

3

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
100
Active Projects
59
Bidding Soon
867
All Active Projects
346
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 13, 2024

March 14, 2024

img_map_placeholder

2990 Bay Blvd NE, Palm Bay, FL

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.