Published February 14, 2024 at 7:00 PM

Updated February 15, 2024

Renovation of an educational facility in Thomasville, Georgia. Completed plans call for the renovation of a educational facility.

**As of February 14, 2024 project was awarded to Dudley Moore Flooring , awarded amount is $129,869.35** Work includes full renovation of restrooms, custodial closets, and water fountains found on the 300 and 400 Hallways of Cross Creek Elementary School during the summer of 2024. The 500 Hallway of same school shall serve as the basis of design for this project. The project will include the removal of all tile and plumbing fixtures including toilets, lavatories, mop sinks, and water fountains found on the 300 and 400 Hallways and the installation of new tile and fixtures. Plumbing work will be bid as a separate package. Labor includes demolishing existing wall tile, the drywall and sound board insulation behind the wall tile, and the floor tile, and the installation of new sound board panels, new water resistant drywall, and new floor tile, trim pieces and wall tile as listed in Exhibit A. All demolished material shall be placed in a school-system supplied dumpster. Labor shall include all work required to complete the project including all demolition and floor prep. Work Location: Cross Creek Elementary School 324 Clark Road Thomasville, GA 31757 The tile contractor will be expected to coordinate his work schedule with the plumbing contractor and the school district. The school district will serve as the project manager for the overall job. Time is of the essence in completing this job as all work must be accomplished during the summer vacation and must be completed in time for the school district to clean the hallways after work has been completed before teachers return to work for the 2024-2025 school year. The remainder of the school site not involved in renovations will be in operation during the summer. Work must be scheduled to avoid disruptions to the operations of the remainder of the school between 7:30 AM and 3:30 PM. The last day for students for the 2022-2023 school year will be Friday, May 17. Teachers will work through Tuesday, May 21. Demolition of plumbing fixtures may begin as early as Saturday, May 18, and must begin no later than Monday, May 20. To facilitate flooring and tile work, plumbers must complete the removal of all plumbing fixtures on the 300 Hallway by Monday, May 27. Tile demolition and replacement will begin as soon as plumbing demolition is complete. The removal of fixtures on the 400 Hallway must be completed by Cross Creek Elementary School Restroom Renovations 2024 - Floor and Wall Tile Package Page 2 of 2 Monday, June 10. All floor and tile work on the 300 Hallway must be completed by June 23. All floor and tile work on the 400 Hallway must be completed by July 10.

Award

Educational

$129,869.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
90
Active Projects
43
Bidding Soon
575
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 9, 2024

May 18, 2024

Project location map

324 Clark Rd, Thomasville, GA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.