EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 15, 2024 at 8:00 PM

Updated October 1, 2024

Site work for a road / highway in Sierra Vista, Arizona. Completed plans call for site work for a road / highway.

As of April 15, 2024, this project has not yet been awarded. A timeline for the award has not yet been established. The City of Sierra Vista will accept competitive sealed bids from experienced contractors to purchase and install solar-powered street lights in the Cloud 9/Montebello/Whispering Springs subdivisions. The Engineer's estimate for the entire project is: $600,000 however the City will select the quantity of street lights to complete based on its available budget (about 50% of the entire project total). The City of Sierra Vista has been awarded a grant through the Federal Transportation Administration (FTA) and Award shall be to the lowest responsive and responsible bidder. This purchase is partially funded by the Federal Transit Authority as part of the 5307 Urbanized Area Formula Funding Program (49 U.S.C. 5307). This purchase will be subject to all applicable federal requirements of the grant under 2 CFR 200 and FTA Circular 4220.1F. Davis Bacon wages will apply. Additional Pre bid meeting Note: or Virtual via Teams (Paste this link in your browser):https://teams.microsoft.com/l/meetup-join/19%3ameeting_MDdkNTE0YTktYTc2Mi00OWVjLTlmNjQtM2Y1ZWViN2IyNDRh%40thread.v2/0 context=%7b%22Tid%22%3a%2236676c86-4a76-422a-8d4e-223152386488%22%2c%22Oid%22%3a%22042b5545-ecdd-4810-9775-87df99239d19%22%7d Meeting ID: 277 206 855 988 Passcode: mG8fEH Or call in (audio only) +1 602-704-1809,,485445631# United States, Phoenix Phone Conference ID: 485 445 631# Any questions, requests for an interpretation or comments regarding the IFB must be submitted in the OpenGov Portal, at the Pre-Bid meeting, or emailed to Kennie.Downing@SierraVistaAZ.gov. City's response to questions February 12, 2024 by 5:00pm The Contractor shall purchase and install up to 54 solar light poles and bases. The poles, luminaries, solar panels, batteries, battery boxes, wiring, controllers, and J-bolts shall be supplied by a single Solar Lighting Supplier as described in the Materials and Performance Specifications. The Contractor will construct pole bases at each location as shown in the attached photos. The pole bases will be constructed in accordance with the attached detail. Work associated with this project shall be completed within 120 calendar days of delivery of the lighting equipment.

Bid Results

Roads / Highways

$470,049.00

Public - City

Site Work

3

10

12

3

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
19
Active Projects
12
Bidding Soon
101
All Active Projects
50
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 20, 2024

March 21, 2024

img_map_placeholder

Multiple Locations, Sierra Vista, AZ


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.