BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Green Mountain Falls, Colorado. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; sidewalk / parking lot; and sidewalk / parking lot.

Reference Number 0000340039 Job Location: 7010 Lake Street, Green Mountain Falls, Colorado 80819 The project must be complete no later than May 23rd, 2024. Question Acceptance Deadline 02/07/2024 05:00 PM MT Questions are submitted online No, Project related questions may be submitted up to and should be submitted to Town Staff: Bo Ayad, Clerk@gmfco.us Becky Frank, manager@gmfco.us Obtain competitive proposals from qualified individuals or firms interested in improving access to transportation services and infrastructure, removing impediments to mobility, and increasing access to opportunities through the Gazebo Bridge Rehabilitation & ADA Accessibility Project. A description of the existing bridge structure is as follows: A wood pedestrian walk bridge, spanning 60' from the 50' causeway to Gazebo Island on Gazebo Lake. The bridge deck is 60' long, comprised of 75, 1.5x9x12' spaced wood planks. The bridge deck is 12' wide with a wood handrail on each side, 38" high, on 5' center posts, with 1 center rail. The bridge deck carries 8 wood benches and 6 light-poles spanning the length. The bridge deck carries water and electric services to the island underneath. The bridge deck is supported by 4 wood laminated beams, in 3 segments 20" in length. The 2 main support beams are 7"x12" in girth. The 2 side beams are 3"x12" in girth. The support beams are founded by 3 concrete piers and 1 concrete buttress, at each 20' intersections of the beam-spans. The 3 piers are comprised of 2 steel-reinforced concrete columns 16" in diameter, rising 5' from the bottom of the lake tied into a concrete header 22"x12x12'. The 1 buttress is 22"x12"x12' on the island. Buyer Preferences, Guidelines & Requirements General Requirements - Bidder /Preregistration Required - Certified Payroll - Contractors License Required - Federally Funded - Installation Required - Insurance Required - Prevailing Wage Required Town of Green Mountain Falls reserves the right to reject any and all proposals. The Project budget must not exceed $138,000. Interested consultants should provide a scope of work and a practical budget for undertaking the project. The respondent should consider GMF's overall operating budget and limited staff to be as efficient as possible. Suggestions and solutions that minimize the expenses associated with tasks are welcome. The Town intends to select a consultant and begin work as weather and ice conditions at the lake permit. The project must be complete no later than May 23rd, 2024

Post-Bid

Bridges / Tunnels

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

39 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
179
Active Projects
88
Bidding Soon
1,347
All Active Projects
560
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

February 13, 2024

March 14, 2024

May 23, 2024

img_map_placeholder

7010 Lake St, Green Mountain Falls, CO

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.