Site work and paving for a mixed-use development in Howard, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

800 L.F. - Sanitary Sewer 3,800 Tons - Crushed Aggregate Base Course 850 L.F. - Storm Sewer 320 Tons - Asphaltic Pavement 765 L.F. - Watermain 1,500 L.F. - Concrete Curb & Gutter 21,000 C.Y. - Excavation 7,700 S.F. - Concrete Sidewalk. Work involves the construction of traffic control, stripping of topsoil, erosion control, rough grading, excavation and trenching, backfilling, sanitary sewer, storm sewer, watermain, valves, hydrants, laterals, services, compaction, manholes, inlets, castings, dewatering, filling, grading, base course, curb and gutter, setting of inlet and manhole castings, asphaltic paving, sidewalks, topsoiling, restoration and testing. The project is scheduled to be completed by June 28, 2024. Each proposal must be accompanied by a Bid bond or certified check equivalent to 5% of the maximum proposal. The Owner reserves the right to reject any or all bids, waive or not waive any informalities in the bids received, and to accept any proposal, which they deem most favorable to the interest of the Owner. No bidder may withdraw his bid within 150 days after the actual date of the opening thereof. This digital project information. No paper plan sets will be provided. Please contact us at 920-434-4060 if you have any questions. Josh Gerrits, P.E. Village Engineer The following schedule is anticipated to complete the project: PHASE 1 2 Weeks - April 1, 2024 to April 12, 2024 Roadway Contractor - Install erosion control and strip topsoil. Rough grade entire project north of drainage ditch. Remove drain tile. PHASE 2 5 Weeks - April 15, 2024 to May 17, 2024 Utility Contractor - Install all utiltites. PHASE 3 6 Weeks - May 20, 2024 to June 28, 2024 Roadway Contractor - Complete road work. Question Deadline 01/26/2024 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Bid Results Base Bid #1 - Degroot - $440096 Base Bid #2 - KCG - $250733

Bid Results

Roads / Highways

$690,829.00

Public - City

Paving, Site Work

4

16

4

Subscribe For Documents

45 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
32
Active Projects
14
Bidding Soon
260
All Active Projects
107
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 5, 2024

April 1, 2024

img_map_placeholder

Multiple Locations, Howard, WI

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.