BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a road / highway in Fernandina Beach, Florida. Working plans call for site work for a road / highway.

As of April 16,2024, project will not be awarded. No definite date for the rebid. As of March 1,2024, this project has not yet been awarded. A timeline for award has not yet been established. The City of Fernandina Beach's downtown district holds multiple festivals and events in the downtown area drawing large crowds which require road closures for the safety of the public. Historically, the City has erected temporary barricades and other devices to block vehicular traffic from entering the festival zones full of pedestrians. While these temporary barriers perform reasonably well, significant monitoring to maintain proper placement is required. The City is interested in pursuing more efficient barricades consisting of the placement of retractable vertical bollards that recess into the pavement surface at numerous locations where potential entry to the festival areas are routinely breached. The scope of work for this is for the Vendor to provide and install (60) sixty bollards in the existing pavement at locations shown on the Attachment included. SCOPE OF WORK All tools, materials, labor, supervision, and equipment for project including, but not limited to, mobilization/demobilization, material/product delivery, and installation. GENERAL CONSTRUCTION GUIDELINES 1. The contractor shall be required to coordinate his work schedule with the City during the course of the project. 2. The Contractor is required to submit his design and installation procedures for review & approval prior to installation. 5. Contractor agrees to commence work within ten days after the Notice to Proceed is issued and to complete all work within 120 calendar days from Notice to Proceed. 6. Contractor is solely responsible for all construction means, methods, techniques, sequences, procedures and coordinating all portions of Work under Contract. 7. Contractor is responsible for all acts and omissions of his Subcontractors. CONTRACTOR PERSONNEL 1. CITY reserves the right to reject any CONTRACTOR employee doing business for the awarded CONTRACTOR that has not received the proper safety training or is not performing work in a safe manner. Any costs resulting in a rejection of personnel will be solely at the CONTRACTOR's expense. 2. No sub-contractor shall be employed by CONTRACTOR for the provision of these services without the prior written approval of the CITY. PERFORMANCE STANDARDS/QUALITY REQUIREMENTS In addition to those requirements set forth in the Scope of Work, all services (and items incidental thereto) and work provided by CONTRACTOR shall conform to the following: PROJECT SCHEDULE CONTRACTOR shall begin no later than ten calendar days from issuance of Notice to Proceed; all work must be completed within 120 calendar days of Notice to Proceed. Specification questions during the bid period shall be submitted in writing to City Engineer, Charles George, cgeorge@fbfl.org with a copy to Purchasing Agent, Wanda Weaks, wweaks@fbfl.org. BID BOND: a. If the Base Bid or the Base Bid plus the sum of any alternates fall into the criteria above requiring a Bid Bond, the bidder shall enclose a Certified Check or Bid Bond with each bid. A Certified Check or Bid Bond shall be for an amount not less than five percent (5%) of the Bid price and shall be made payable to the CITY OF FERNANDINA BEACH as a guarantee that the Bidder will not withdraw its bid for a period of ninety (90) calendar days after Bid closing time. Bid Bonds or Certified Checks will be returned to unsuccessful bidders within 10 days of bid award. Successful bidders will receive their Certified Check or Bid Bond after the contract/agreement has been signed and a Performance and Payment Bond is received. PERFORMANCE AND PAYMENT BONDS: a. In the event the Contract is awarded to the Bidder, Bidder will thereafter enter into a written contract with the CITY OF FERNANDINA BEACH and furnish a Payment and Performance Bond in an amount equal to the contract price. The form of the bonds shall be in accordance with Section 255.05 of Florida Statutes. Failing to do so, Bidder shall forfeit its bid security. Payment and Performance Bond shall be secured from or countersigned by an agency or surety company recognized in good standing and authorized to do business in the State of Florida. Questions regarding bid package can be directed to Wanda Weaks, Purchasing Agent, wweaks@fbfl.org.

Final Planning

Roads / Highways

$217,440.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
68
Active Projects
36
Bidding Soon
598
All Active Projects
244
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 27, 2024

October 16, 2024

img_map_placeholder

DOWNTOWN VEHICULAR STREET, Fernandina Beach, FL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.