Demolition and site work for a municipal facility in Norcross, Georgia. Completed plans call for the demolition of a municipal facility; and for site work for a municipal facility.

The City of Norcross is soliciting sealed competitive bids from qualified Contractors for the abatement, demolition, haul off, and stabilization of existing structures for the locations listed below: Structure 1 74 Stevens Road Norcross, GA 30071 Structure 2 84 Stevens Road Norcross, GA 30071 Structure 3 98 Stevens Road Norcross, GA 30071 Demolition of structures will consist of the furnishing of all materials, labor, and equipment for the utility cut off, abatement, proper filings, demolition, haul off and erosion control/site stabilization. Please submit questions/requests via e-mail only to the Capital Projects Manager at procurement@norcrossga.net by 11:00 a.m. on January 30, 2024, and visit https://www.norcrossga.net/bids.aspx for detailed bid information and submission guidelines. We appreciate your interest in the City of Norcross! 1/21,2024 PROJECT SCOPE The project will consist of caping the existing utilities at the main, performing required abatement, demolition, haul off, and stabilization of the structures/area.Contractor to perform all work in accordance with federal, state, and local guidelines Abatement: Prior to demolition, asbestos abatement will be required. Asbestos reports are included as Appendix E. Contractors scope includes performing all required local, state, and federal required filings, notifications, and proper disposal. A copy of the Contractors Georgias Asbestos License should be included in the proposal package. Demolition: Scope includes proper demolition of the structures and their footers/foundations. Scope includes Contractors coordination efforts to shut-off and cap all utilities to the structures. Contractor shall coordinate all efforts with the City and applicable utility provider. Stabilization: The Manual for Erosion and Sediment Control in Georgia, 2016 Edition, by the Georgia Soil and Water Conservation Commission, shall be applied to all land disturbing activities. Contractor shall install perimeter erosion controls prior to the beginning of demolition activities. Contractor shall utilize GSWCC approved Best Management Practices (BMPs) in the appropriate context to prohibit the trespass of sediment from the project site. Once building slabs or foundations have been removed, Contractor shall establish a consistent grade and ensure positive drainage. Contractor shall provide temporary stabilization throughout the demolition process as needed. Permanent stabilization shall be achieved using sod and/or seeding. Prior to project acceptance, grassing shall be fully established and all temporary BMPs shall be removed. Phase I Environmental Study: A Phase I report shall be provided to the bidders as part of the Addendum for Submitted Questions

Post-Bid

Municipal

$130,000.00

Public - City

Demolition, Site Work

3

5

6

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
305
Active Projects
191
Bidding Soon
2,288
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 6, 2024

March 7, 2024

Project location map

Multiple Locations, Norcross, GA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.