BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Vernon Hills, Illinois. Completed plans call for the renovation of a educational facility.

A. The Project consists of the following general activities as described in the Construction Documents and Project Manual for D128 Vernon Hills Summer 2024 Renovations, located in Vernon Hills, Illinois for Community High School District 128. B. The work of the Project shall include all labor, material, and equipment to provide complete installation of all work including all code required devices and functions that may not specifically be indicated in this Project Manual. 1. The work includes (not to be taken as a complete description or extent of the work) as follows a. Selective demolition of ceilings, walls, finishes b. selective demolition and replacement of existing suspended acoustical and painted gypsum board ceiling system and lighting; reinstallation of electrical devices and HVAC grilles and equipment to remain c. selective demolition and replacement of existing piping and fittings d. selective demolition and replacement of existing HVAC ductwork and controls e. new fire protection, fixtures, electrical and HVAC work f. new finishes and patching of walls, and ceilings Failure to attend and sign in at the pre-bid conference and site inspections shall result in the rejection of any bids submitted by those non-attending Contractors. This will be the only time that the Contractors shall be allowed escorted access to the project site. The Board of Education, Community High School District128 reserves the right to reject any and all bids or parts there of, to waive any irregularities or informalities in bidding procedures, and to award the contract in a manner best serving the interest of the School District. All Bidders must comply with Illinois Revised Statutes,1981, Chapter 48, Section 39s-1 through 39s-12, requiring the payment of prevailing wage rates to all laborers, workmen and mechanics working on publicly-funded projects. If during the time period of work, these rates change, the contractor shall be responsible for additional costs without any change to the contract amount.

Award

Educational

$545,000.00

Public - County

Renovation

22

20

15

7

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
203
Active Projects
97
Bidding Soon
2,150
All Active Projects
877
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 9, 2024

May 28, 2024

img_map_placeholder

145 Lakeview Pkwy, Vernon Hills, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.