Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 8, 2025 at 8:00 PM
Updated May 9, 2025
Site work for a water / sewer project in Fitchburg, Wisconsin. Design plans call for site work for a water / sewer project.
The Syene Interceptor will need to be extended in phases as development progresses south of Lacy Road. 2021-2030 CIP Update: Added another phase in 2029/2030 based on anticipated development. This phase installs ~6,100' of 36" interceptor sewer between Lacy Road and Irish Lane. 2023-2032 CIP Update: Moved 2,200' of 36" interceptor installation up to 2023 from 2027 and adjusted cost to reflect earlier timing. This acceleration will allow the next phase of the interceptor project to be installed to Hartung's south property line. The 2029/2030 phase is proposed to extend from Hartung's south property line to Irish Lane (total length ~3,000'). 2024-2033 CIP Update: Increased estimates for all phases to better correlate with increasing construction costs. Additional $577,500 in 2024 and reduced length of 2024 interceptor extension by 300 feet based on current preliminary schematics. Increased 2029 from $90,000 to $135,000. Increased 2030 from $900,000 to $1,350,000. As of May 8, 2025, this project is included in the City of Fitchburg's FY 2024 2033 CIP. It is currently in the design phase. Construction is expected to begin in late 2025. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Design
Water / Sewer
$1,875,000.00
Public - City
Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 1, 2025
To Be Determined, Fitchburg, WI
Related To This Project
Fitchburg, WI
--
Fitchburg, WI
--
Fitchburg, WI
--
Fitchburg, WI
--
Fitchburg, WI
--
Fitchburg, WI
--
Fitchburg, WI
Bid Date: Feb 02 2024
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
