BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in Marshall, Michigan. Working plans call for the renovation of a municipal facility.

As of March 15, 2024, this project has not yet been awarded. A timeline for award has not yet been established. The City of Marshall is seeking proposals from firms qualified and experienced in designing, implementing and supporting physical access control systems. This will replace the existing Lenel access control system in the MRLEC (Marshall Regional Law Enforcement Center) Building and the Digital Management System (System Link) in the Public Services Building and City Hall, while also adding an access control system in the Power House Building. Each respondent must submitin a sealed envelope o one (1) original proposal o three (3) additional proposal copies o one(1)digital copyoftheproposalpreferablyonaUSB/flashdrive as one file in PDF format. Written Question Submission Deadline February 6 th 2024 Proposal Content questions shall be e-mailed to Facility Manger Jake Andrews at jandrews@cityofmarshall.com. RFP Process and Compliance questions shall be e-mailed to City Purchasing Agent, Christy Ramey, at CRamey@cityofmarshall.com. The City of Marshall is seeking proposals from firms qualified and experienced in designing, implementing and supporting physical access control systems. This project will replace an existing Lenel access control system that is used in the Marshall Regional Law Enforcement Center Building (MRLEC). It would also replace the Digital Management System (System Link) at the Marshall City Hall and Public Services Building (PSB), along with installing a new system for the Marshall Powerhouse Building. The City of Marshall is also seeking integration to use one uniform system for access control citywide. The MRLEC has a Lenel control system that was installed in 2015. Marshall City Hall and Marshall PSB utilizes a Digital Management System (System Link) what was installed 10-20 years ago. All City locations are connected via fiber optic cable network. The application, server and database will also need to be updated/replaced.

Final Planning

Municipal

$79,743.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
101
Active Projects
49
Bidding Soon
1,068
All Active Projects
435
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 23, 2024

August 5, 2024

img_map_placeholder

714 US Hwy 27 N, Marshall, MI

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.