BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Marshall, Michigan. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

The City of Marshall seeks engineering design proposals on three projects: 2024 Small Urban Project, NE NIA Forest Street Extension, and NE NIA Valley View Development Infrastructure. This project includes engineering design to rehabilitate West Drive, from Michigan Avenue to Verona Road and Verona Road from West Drive to Mansion Street in the City of Marshall. Construction of this project will be partially funded by the Michigan Department of Transportation's (MDOT) Small Urban project. The City of Marshall is extending the east end of Forest Street from its current dead end northeasterly to O'keefe Road. The extension will serve the Briarwood Lane Condominiums on Forest Street being constructed under the City's Northeast Neighborhood Improvement Authority (NE NIA). The City of Marshall needs design services for a new development, Valley View, in the NE NIA. The Valley View development, east of Allen Road and south of O'keefe, consists of traditional green field development requirements. The City plans to rehabilitate West Drive and Verona Road through mill and resurface of the asphalt surface, installation of sidewalk along Verona from Sherman Drive to West Drive, and necessary improvements to existing sidewalk ramps under the MDOT Small Urban Grant Program. The pre-design phase of this project shall include a kick off meeting with City staff, survey of the project area, and soil borings/pavement cores at designer selected locations, and CCTV footage of the sanitary and storm sewer systems in the project area. West Drive is a three lane north/south road with curb/gutter and sidewalk on the east side. It serves commercial businesses and connects both the state trunkline (Michigan Ave) and county primary road (Verona Road west of West Drive). Verona Road is a two lane east/west corridor connecting residential areas to commercial and outlying county roads. Sidewalk is located along the north side of Verona between Mansion Street and Sherman Drive. A plan to connect the sidewalk on West Drive and the sidewalk at Sherman and Verona is part of the design requirements. The topography along the Verona Road corridor poses challenges with both sidewalk and storm water drainage and must be carefully analyzed in the design solution. Currently, no significant storm water issues exist and the selected designer must ensure they are not created by the road rehabilitation or installation of sidewalk. Storm water is managed via surface controls on Verona between West Drive and Mansion Street. The only known underground storm water asset within the Verona Road scope is the outlet culvert from Sherman Pond located adjacent to 930 Verona Road. Analysis of this culvert is not included in the design engineering scope. Storm water on West Drive flows south from Verona Road to Michigan Ave. The City of Marshall reserves the right to take other action before a contract is signed or a purchase order is approved; even after City Council accepts or approves the proposal. Question Deadline 01/16/2024 E-Mail Communication and questions regarding this proposal must be directed to Marguerite Davenport, Director of Public Services at MDavenport@cityofmarshall.com The method of Contractor Selection has not been Determined at this time. Project Completion: Various

Conceptual

Roads / Highways

$1,675,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
101
Active Projects
49
Bidding Soon
1,068
All Active Projects
435
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 27, 2025

img_map_placeholder

Multiple Locations, Marshall, MI

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.