EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 9, 2024 at 8:00 PM

Updated October 1, 2024

Renovation of an educational facility in Stony Brook, New York. Completed plans call for the renovation of a educational facility.

Stony Brook University Hospital intends to make an award for the above noted commodity, product and/or service. A sealed bid will be held. If you are interested in providing a proposal for the above commodity/product and/or service, you must contact the appropriate designated Campus contact in this Advertisement Notice. The main features of the work to be done under the Contract, in accordance with the Contract Documents shall include, but not be limited to the following: The work to be done under the Contract, in accordance with the Contract Documents, consists of furnishing and installing all materials, equipment, labor and incidentals necessary or convenient for the construction of Project Number 24101, titled Repair of HSC Loading Dock and carry out all of the duties and obligations imposed upon the Contractor by the Contract Documents. The main features of the work shall include, but not be limited to the following: 1. Overview Loading dock Angle repair, Metal stair refinishing, 19 column covers install, and various painting/waterproofing, ceiling removal, soffit construction, Firecote and seal, bird control, demo and install new sprinklers on loading dock and add sprinklers over dumpsters and construction storage cage providing hydronic calculations/plans. 2. Scope of Work Replace existing loading dock angle -Approx. 100 LF Paint loading dock angle and wall -Approx. 150 LF Replace existing loading dock Bumpers -31 EA (see attached for material pricing) Paint existing handrail for stairs, and ramp. -Approx. 75 LF Patch loading dock concrete missing next to angle -Approx. 30 CF Stair #1 refurbishing Remove rust from existing stairs Paint coating existing stairs-5 Rungs with kickplate Install new pre-fabricated stair tread, pin to existing -5 Rungs with kickplate. Stair #2 refurbishing/replacement (In worse shape may need to replace) Remove rust from existing stairs Paint coating existing stairs-5 Rungs with kickplate Install new pre-fabricated stair tread, pin to existing -5 Rungs with kickplate Replacement estimated as an Alternate Remove existing pre-fabricated stairs Install new pre-fabricated stairs (aluminum) Column Panel Install Install pre-fabricated steel panel to cover existing damaged colums-45"H x 20" W x 11" D. Total 8 Full 3 Half columns- Each full column will need two panels. Paint existing columns and new steel panels (yellow)- 11EA Ceiling removal Removal of Shotcrete ceiling approx. 15,050 sq. ft Removal of black iron Removal of tie wires Support/Re-support existing infrastructure; electrical, cameras, ductwork, etc. Vertical Wall Enclosure, Soffit Install new soffit to match existing. Fire proofing and Sealing of Exposed Steel Apply Cafco Bond Sealer Type EBS to all exposed fireproofing throughout Application to strictly follow manufacturer's specifications and guidelines Includes all area protection and clean up All work to meet NYS building codes Patch all fireproofing where missing or damaged throughout Loading Dock where plaster ceiling panels have been removed All fireproofing repair to match existing thickness and material Includes all area protection and clean up. Bird Control Install new soffit to match existing approx. 1250 sq. ft Type: Knotless, extruded and pre-stretched nets. Nets are to be both seamless and borderless for clean edges and easier perimeter fastening. Opening: 1/2 " (1.3 cm) square. Width: 14'(4.2 m) Lengths -50'(15.2 m), 100'(30.4 m), 250'(76.2 m) and 3,000'(914.4 m). Average strength -10 lbs. per strand (4.5 kg). Average strand count -2 per inch. Weight: 8.5 lbs. (3.8 kg) per 1,000 square feet Melting point (approximately): 320+ degrees F. Flash point (approximately): 625 degrees F. Warranty: 5-year limited warranty. Fire Sprinklers Demo existing sprinklers on loading dock Provide hydronic calculations, shop drawings and plans, signed and sealed drawings. Install new dry system to loading dock, dumpster area and construction cage. RFI due date has been moved from Thursday February 8, 2024 to Friday February 16, 2024 at 5:00PM & RFI's responses due date has been moved from Thursday February 15, 2024 to Thursday February 22, 2024 at 5:00pm

Post-Bid

Educational

$124,000.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

9

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Temporary Utilities, Temporary Lighting, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Bonds
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Facility Remediation, Transportation and Disposal of Hazardous Materials, Asbestos Remediation
Division 03 - Concrete

Division 03 - Concrete

Precast Concrete
Division 04 - Masonry

Division 04 - Masonry

Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Partitions, Safety Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Lockers, Exterior Specialties, Protective Covers
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Loading Dock Equipment, Loading Dock Bumpers
Division 12 - Furnishings

Division 12 - Furnishings

Furniture
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Other Conveying Equipment, Pneumatic Tube Systems
Division 26 - Electrical

Division 26 - Electrical

Facility Electrical Power Generating and Storing Equipment, Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Special Foundations and Load-Bearing Elements, Bored Piles, Drilled Caissons, Caissons
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Planting
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists, Cranes, Gantry Cranes, Derricks, Lifting Devices, Hooks, Mobile Plant Equipment, General Vehicles, Carts

Find More Local Projects

Within 75 Miles of This Project
473
Active Projects
253
Bidding Soon
4,437
All Active Projects
2,021
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 8, 2024

April 4, 2024

img_map_placeholder

101 Nicolls Rd, Stony Brook, NY


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Repair of HSC Loading Dock

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.