BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 1, 2024 at 7:00 PM

Updated March 2, 2024

Site work, paving and outdoor lighting for a mixed-use development in Independence, Oregon. Completed plans call for site work for a playground / park / athletic field; for outdoor lighting for a playground / park / athletic field; for paving for a playground / park / athletic field; sidewalk / parking lot; sidewalk / parking lot; sidewalk / parking lot; water / sewer project; and water / sewer project.

Bids submitted after the specified date and time shall not be considered. The Project generally consists of minor site grading, construction of concrete sidewalks, transport of Owner-provided site furnishings from Owner's yard to the site, installation of site furnishings provided by the Owner, installation of new conduit and pull rope for future lighting, design-build installation of an irrigation system, minor stormwater improvements, and procuring plant materials, oversight of plant installation by Owner-provided volunteers, maintenance, and warranties of plant materials using Contractor-forces, and all labor, Equipment, Materials, and incidentals necessary to complete the Work as specified. The project also includes three bid alternatives. Registering as a Planholder is recommended for all prime contractors and subcontractors as Planholders so they will receive automatic notice of addenda and other contract document updates via online. This contract is for a public works project subject to ORS 279C.800 to 279C.870 (state prevailing wages) as applicable. Est. Completion Date: Sept. 6, 2024 Question Deadline 02/15/2024 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all parties recorded as having received the Bidding Documents. Questions received less than seven (7) days prior to the date for opening of Bids may not be answered. Questionsregarding the projectshould be referred to Shannon Williams, PE, (swilliams@kellerassociates.com).

Award

Playgrounds / Parks / Athletic Fields

$450,048.00

Public - City

Outdoor Lighting, Paving, Site Work

16

22

10

10

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
119
Active Projects
42
Bidding Soon
1,018
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 22, 2024

September 6, 2024

Project location map

1296 S 8th St, Independence, OR

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.