Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a municipal facility in Greeley, Colorado. Completed plans call for the renovation of a municipal facility.
Reference Number 0000340642 Delivery Point: P.O. Box 758 / 1401 N 17th Avenue, Greeley, CO 80632 Question Acceptance Deadline 02/05/2024 10:00 PM MTQuestions are submitted online No, Please call Aleksei Churyk or Charles Simons at 970-400-2555 or 970-400-2602 Number if you have any questions. Weld County's requested start and full completion dates of the project are as specified; Start: March 1, 2024 Completion: April 15, 2024. Weld County is requesting the cabling at the Weld County Facilities building. The project includes a total of 68 category 6 cables (Color BLUE). 63 cables will be in the Facilities building from a data closet to the specific locations in the same building. 5 cables will be in the Fleet building from a data closet to the specific locations in the same building. Note: The Faciliteis building is a single floor building. All associated patch panels and pathways are to be verified and provided by the contractor. No additional racks are required. Additonal patch panels and all other data closet equipment as specified is required to be installed. Patch cables (Color GREEN) at the specified amount in the details section are required prior to signoff. Specific details will be provided during the mandatory walk-through. The project is considered an all-inclusive cabling turnkey solution. Building electrical diagrams will be provided at the mandatory walk-through. 2 additional 6 vertical cable management units are being requested, but not to be installed. Contractors are to furnish all labor, equipment, supplies, and material as necessary for the copper, fiber, data closet and all other components of the installation project. The project is to include the installation of specified cabling per the identified materials in the specification sheet. The installation will use industry standards in addition to requirements listed in this bid. Access into county facilities will be granted via escort and facility sign in will be required. All cabling test results, and as-built engineering documents are to be provided in both physical hard copy and electronically 30 days from project completion. There shall be a warranty for all materials and labor for a period of not less than one full year after the work has been accepted by the County. This in no way limits or reduces the warranty offered by any manufacturer of material or equipment used in maintenance or repairs. Buyer Preferences, Guidelines & Requirements General Requirements - Bidder /Preregistration Required - Employee Background Checks Required - Installation Required - Insurance Required - Local Service Required - Warranty Information Required Award Requirements - All or None Award The successful Bidder shall be required to execute the Performance Bond and Labor & Materials Payment Bond in the amount of 100% of the Contract plus the value of the force account items, covering the faithful performance of the Contract and the payment of all obligations arising there-under Weld County reserves the right to reject any and all bids, to waive any informality in the bids, and to accept the bid that, in the opinion of the Board of County Commissioners, is to the best interests of Weld County.
Post-Bid
Municipal
$50,000.00
Public - County
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 7, 2024
March 1, 2024
1401 N 17th Ave, Greeley, CO
Related To This Project
Greeley, CO
Bid Date: Feb 16 2024
Greeley, CO
Bid Date: Feb 09 2024
Greeley, CO
Bid Date: Feb 23 2024
Greeley, CO
--
Greeley, CO
Bid Date: Mar 01 2024
Greeley, CO
Bid Date: Feb 28 2024
Greeley, CO
Bid Date: Feb 26 2024
Greeley, CO
--
Greeley, CO
--
Greeley, CO
Bid Date: Feb 28 2024
Greeley, CO
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.