BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 27, 2024 at 7:00 PM

Updated November 9, 2024

Site work and new construction of a mixed-use development in Oak Creek, Wisconsin. Completed plans call for the construction of a warehouse / distribution facility; for site work for a warehouse / distribution facility; and water / sewer project.

Site Directions: W. DREXEL AVENUE IN OAK CREEK, WI, BETWEEN 13th STREET AND S. 6TH STREET The work, officially known as Project No. 21018, DREXEL AVENUE STORMWATER LIFT STATION REPLACEMENT, consists of one lump-sum prime Contract and generally constructing the following: demolition; wet-well modifications; 2 new submersible pumps; 200 LF of 12" dia. HDPE force main; 12" check valves , Pre-engineered utility building and control panel; concrete; equipment mechanical and electrical work; and bypass pumping, dewatering, restoration, erosion control, start-up, and traffic control. After Work has begun, work shall be completed in a continuous manner until the project is complete. The Project shall not begin until June 1, 2024. The entire project shall be operational prior to October 4, 2024, and complete including restoration on October 18, 2024. Bid Results: BASE BID - USING ENERGENECS AND TRACHTE AS SUPPLIERS: Mid City Corporation $1,198,500 BASE BID - USING LW ALLEN AND USEMCO AS SUPPLIERS: Mid City Corporation $1,093,000

Award

Water / Sewer

$1,093,000.00

Public - City

New Construction, Site Work

36

19

7

7

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
473
Active Projects
276
Bidding Soon
2,688
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 9, 2024

June 1, 2024

Project location map

W Drexel Ave, Oak Creek, WI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.