BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and outdoor lighting for a mixed-use development in Pittsburgh, Pennsylvania. Completed plans call for site work for a road / highway; for paving for a road / highway; for outdoor lighting for a road / highway; bridge / tunnel; bridge / tunnel; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

For the Bridge Rehabilitations, Approach Roadway Reconstruction, Drainage, Guide Rail and Barrier, Curb and Sidewalk, Signals, Signing and Pavement Markings, Highway Lighting, Painting Structural Steel, and Other Miscellaneous Construction, All Within a Length of 2,550 Linear Feet (0.483 Miles) as Indicated on the Approved Drawings Included in the Bid Package for Charles Anderson Memorial Bridge (Boulevard of the Allies), in Allegheny County, City of Pittsburgh, Commonwealth of Pennsylvania. This Project Being Situated as Follows: From a Point Approximately 200 Feet West of Dawson Street at Station 5+50 to a Point Approximately 250 Feet East of the Northeast Connection to Panther Hollow Road at Station 33+00. Project Cost Range: $45,000,000.00 - $49,999,999.99 Federal Project Status: PENNDOT Oversight NHS Structure Work: 84.00% Pre-bid Meeting: Optional Wage Rates: Yes Prequalification Requirement: Yes Prequalified Subs as Prime: No State Type of Work: Bridge Over Active Rr Tracks Responses to questions on this page are for informational and clarification purposes. Official changes to the proposal will be made via an Addendum. The deadline for submitting questions is 72 hours before the let date and time. For Emergency projects, the deadline is reduced to 19 hours before the let date and time. PennDOT - Charles Anderson Bridge *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Bridges / Tunnels

$48,477,777.00

Public - State/Provincial

Outdoor Lighting, Paving, Site Work

646

21

57

10

Subscribe For Documents

40 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
74
Active Projects
36
Bidding Soon
787
All Active Projects
307
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 29, 2024

April 29, 2024

img_map_placeholder

Charles Anderson Bridge, Pittsburgh, PA


Stop wasting time. Get and stay ahead of your competition.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.