BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Divide, Colorado. Working plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

All Bids Rejected Region: 2 Counties: Teller Contract UDBE Goal: 4.00% Work Days: 120 SH 67 - MP 76.92 TO MP 78.20, Resurface Roadway from End of recent US 24 overlay at US 24 to just past Evergreen Heights Road. The from just past Evergreen Heights Road to just before Kelley's Road will be widened to 4 lanes and a middle shared turn lane for most of it and will also have some raised medians near major intersections. Curb and Gutter will be placed along this part of the corridor. Drainage will be updated along this portion of the corridor. Utility coordination is ongoing and is expected to be completed as construction begins, with some utilities to be moved when exposed by construction. Signs and delineators will be updated along entire project corridor. Signal heads at Kelley's Road will be updated to accommodate new lanes. All accesses that are legal within the widening will be updated to match new pavement and some illegal accesses will be removed. Several trees will need to be removed within the clear zone. It is estimated that the total cost of all items in the bid will be: ( ) Between $0 and $1,000,000 ( ) Between $1,000,000 and $5,000,000 (X) Between $5,000,000 and $20,000,000 ( ) Greater than $20,000,000 This project is located in Region 2 in Teller County. Project work consists of road resurfacing and widening on SH 67 from MP 76-78. Please contact Scott Schnake at 719-527-5807 for all project related questions. CODOT: 001- Region 2 - SH 67 Resurfacing and Widening *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. All questions shall be directed to the CDOT contacts listed above no later than 7:00 A.M. Monday of the week of bid opening. Final questions and answers will be posted no later than Tuesday morning of bid opening week.

Final Planning

Roads / Highways

$20,000,000.00

Public - State/Provincial

Paving, Site Work

397

3

6

Subscribe For Documents

86 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
88
Active Projects
33
Bidding Soon
771
All Active Projects
326
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 15, 2024

August 23, 2024

img_map_placeholder

CO-67, Divide, CO


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.