BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 2, 2024 at 8:00 PM

Updated May 3, 2024

Site work, paving and new construction of a mixed-use development in Anthony, New Mexico. Working plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; for the construction of a pre-engineered storage facility; and pre-engineered storage facility.

**As of May 2, 2024 there were no bids received for this project. Project will be regrouped and rebid, but a specific date had not been set. Anthony Youth Farm Phase II Work consists of vertical and flatwork construction in Anthony, New Mexico of 1. Anthony Youth Farm Phase II. Phase II consists of utility connections to existing infrastructure on site. Site improvements to include gravel driveways, rigid concrete paving, concrete sidewalks, irrigation systems and landscape. Building improvements in the base bid include the new construction of a single steel frame building with a footprint of 6,750 SF and all of its associated improvements. By bid alternate a steel silo structure of 24' diameter footprint is being considered in Phase II as well. Bidders' attention is directed to the requirements of the Bidding Documents for adherence to applicable federal, state, and local statutes, regulations, and ordinances, including equal employment opportunity, New Mexico resident contractor preference, New Mexico Retainage Act, and payment of minimum wages and taxes.

Final Planning

Roads / Highways

$1,190,000.00

Public - City

New Construction, Paving, Site Work

65

22

6

3

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
28
Active Projects
11
Bidding Soon
289
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 11, 2024

November 2, 2024

Project location map

NM-478, Anthony, NM


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.