Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 25, 2024 at 8:00 PM

Updated March 26, 2024

Site work and paving for a mixed-use development in North Kansas City, Missouri. Completed plans call for site work for a educational facility; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Three (3) bids were received. Bid Summary Tab: Contractor Bid Amount Wil-Pav, Inc. $338,706 Phillips Paving $359,667 Calvert’s Paving $435,790 The lowest and best bid for this work is Wil-Pav, Inc. for $338,706.00 This project was planned and is within the 2023/2024 maintenance budget. A portion of this project will be paid out of the 2024/2025 maintenance budget. This contract was reviewed by General Counsel. Administrative Recommendation: Based on the evaluation of the bids, it is recommended that the BOE approve and enter into a contract with Wil-Pav, Inc. for $338,706.00 for the performance of this project. Pavement repairs at Bell Prairie Elementary, Gateway6th Grade Center and Golden Oaks Educational Center. The NKCSD Board of Education reserves the right to reject any or all bids and reserve the right to be the sole judge of what it considers the lowest responsible bid. All bids are contingent upon available funding. The NKCSD is an Equal Opportunity Employer.

Award

Educational

$338,706.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
163
Active Projects
69
Bidding Soon
1,301
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 13, 2024

March 13, 2024

Project location map

Multiple Locations, North Kansas City, MO

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed