BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in North Kansas City, Missouri. Completed plans call for site work for a educational facility; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Three (3) bids were received. Bid Summary Tab: Contractor Bid Amount Wil-Pav, Inc. $338,706 Phillips Paving $359,667 Calvert’s Paving $435,790 The lowest and best bid for this work is Wil-Pav, Inc. for $338,706.00 This project was planned and is within the 2023/2024 maintenance budget. A portion of this project will be paid out of the 2024/2025 maintenance budget. This contract was reviewed by General Counsel. Administrative Recommendation: Based on the evaluation of the bids, it is recommended that the BOE approve and enter into a contract with Wil-Pav, Inc. for $338,706.00 for the performance of this project. Pavement repairs at Bell Prairie Elementary, Gateway6th Grade Center and Golden Oaks Educational Center. The NKCSD Board of Education reserves the right to reject any or all bids and reserve the right to be the sole judge of what it considers the lowest responsible bid. All bids are contingent upon available funding. The NKCSD is an Equal Opportunity Employer.

Award

Educational

$338,706.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
64
Active Projects
30
Bidding Soon
720
All Active Projects
306
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 13, 2024

March 13, 2024

img_map_placeholder

Multiple Locations, North Kansas City, MO

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.